| 1. | Once - though demolition of 10 buildings by blasting 栋楼房的总体方案设计 |
| 2. | After completing the frame design of ccdwas , i design its three parts separately 在完成系统总体方案设计后,分别对其三个组成部分进行了设计开发。 |
| 3. | Having presided design of collectivity project and work of design and harmonization of every part 主持了系统的总体方案设计及各部分的设计协调工作。 |
| 4. | The general scheme design of automatic sorting machine was firstly carried out on the rechargeable battery 首先进行了可充电电池质量自动分拣机总体方案设计。 |
| 5. | The whole project about the hardware and software of system is made and a part of program is brought to success 完成了系统软、硬件总体方案设计和部分软件开发。 |
| 6. | Ltd is a professional water processing company and approved by the government as new high - tech enterprise 主营水处理设备、空气净化设备、污水处理工程;并提供总体方案设计以及工程总包等业务。 |
| 7. | Based on the participation in this research project , the analysis of system demand and the overall scheme design are analyzed and summarized in this paper 本文是在参与项目研究的基础上,对系统需求分析和总体方案设计的有关内容的分析和总结。 |
| 8. | The third chapter discusses the whole design of the system . it describes saa7113 of philips corp . and pc19054 of plx corp 第三章介绍了系统的总体方案设计,并详述了philips公司的a d变换芯片saa7113和plx公司的pci接口芯片pci9054的功能和时序。 |
| 9. | The paper mainly studies the parallel mechanism , whole scheme design of the robot , kinematics solution of the parallel mechanism and so on , aiming at the hybrid carrying robot 本论文针对混联式搬运机器人设计,主要研究了并联机构、机器人总体方案设计和并联部分的运动学解析等问题。 |
| 10. | As the principal of the project , the author directly participated in the project including system requirement investigation , systems analysis , systems solutions deign and project implementation 本人作为项目的负责人,直接参与了系统需求调研、系统分析、系统总体方案设计、工程实施等多项工作。 |