Mobile
Log In Sign Up
Home > chinese-english > "排水体" in English

English translation for "排水体"

displacementhull

Related Translations:
排水井:  absorbing wellbleeder wellcatch pitcatchpitdischarging welldrain welldrainage shaftdrainage welldraining welldry wellnegative welloffset wellpump shaftrelief wellwater disposal wellwater s
排水塞:  drain plug
排水暗沟:  covered draindewatering culvertdrainage trenchspray drainunderground run off
排水器:  ad402delfdrainerhydathodewater drain a aratuswater drain apparatus
带状排水:  band shaped prefabricated drain
排水入口:  drainage inlet
陶管排水:  tile drainage
桥梁排水:  bridge drainage
排水垄沟:  furrow-drain
排水工具:  drainage tooldraining kit
Example Sentences:
1.The pore water pressure difference between silt and pvds ( or sand drains ) increases and the soil consolidation velocity is accelerated during the embankment construction
在路基填筑期间,淤泥地基与竖向排水体之间的孔压差增大,加速土体固结。
2.Because of the advantages of prefabricated plastic drains over other vertical drains , this technology is widely used in recent soft clay foundation improvement in our country and it has been a main method in drainage consolidation methods
由于塑料排水板与其它排水体相比具有诸多优点,近几年来在国内软粘土地基处理中被广泛使用,塑料板排水法成为排水固结法中最主要的方法。
3.Some key subjects of numeric analysis were discussed such as : selecting principles of constitutive equations of soft clay , the equivalent theory of vertical drains ground , the definition of load step , the determination of vertical drains as well as the treatment methods of the decline of groundwater level , sealing wall and nearby water source
着重论述了真空预压加固地基数值分析中对土体本构方程的选择、砂井地基等效转换、分析荷载步的确定、竖向排水体的界定、地下水下降的处理、密封帷幕的处理、附近补充水源的处理等问题。
4.The mechanics of vacuum preloading was discussed by contrast of vacuum preloading and heaped preloading . the factors affecting the result of vacuum preloading for ground consolidation were as follows : the geological conditions of site , the intensity of vacuum pumping , the condition of underground water and installation of vertical drainage line . through analysis of these factors , some conceptions and design principles were proposed for vacuum preloading
在此基础上,通过堆载预压与真空预压的对比阐述了真空预压加固地基机理,分析了影响真空预压加固地基最终加固效果的各个因素:场地地质条件、抽真空作用强度、地下水赋存情况及竖向排水体的设置等。
5.A method to back analysis the distribution pattern of negative pore - water pressure along vertical drainage line was proposed . some practical vacuum preloading projects were analyzed . the results showed that distribution patterns of negative pore - water pressure along the vertical drainage line were uniform and the magnitude was about half of the vacuum degree under the membrane
提出由现场实测资料反分析竖向排水体中的负压分布的方法,通过对若干工程实例的反分析,认为真空预压下负压分布沿竖向排水体的分布基本均布,其值约在膜下真空度的50左右。
Similar Words:
"排水隧洞" English translation, "排水他" English translation, "排水台" English translation, "排水陶管" English translation, "排水特性" English translation, "排水体积" English translation, "排水体积中心" English translation, "排水条件" English translation, "排水通道" English translation, "排水筒" English translation