English translation for "排水体"
|
- displacementhull
Related Translations:
排水井: absorbing wellbleeder wellcatch pitcatchpitdischarging welldrain welldrainage shaftdrainage welldraining welldry wellnegative welloffset wellpump shaftrelief wellwater disposal wellwater s 排水暗沟: covered draindewatering culvertdrainage trenchspray drainunderground run off 排水器: ad402delfdrainerhydathodewater drain a aratuswater drain apparatus 带状排水: band shaped prefabricated drain 排水工具: drainage tooldraining kit
- Example Sentences:
| 1. | The pore water pressure difference between silt and pvds ( or sand drains ) increases and the soil consolidation velocity is accelerated during the embankment construction 在路基填筑期间,淤泥地基与竖向排水体之间的孔压差增大,加速土体固结。 | | 2. | Because of the advantages of prefabricated plastic drains over other vertical drains , this technology is widely used in recent soft clay foundation improvement in our country and it has been a main method in drainage consolidation methods 由于塑料排水板与其它排水体相比具有诸多优点,近几年来在国内软粘土地基处理中被广泛使用,塑料板排水法成为排水固结法中最主要的方法。 | | 3. | Some key subjects of numeric analysis were discussed such as : selecting principles of constitutive equations of soft clay , the equivalent theory of vertical drains ground , the definition of load step , the determination of vertical drains as well as the treatment methods of the decline of groundwater level , sealing wall and nearby water source 着重论述了真空预压加固地基数值分析中对土体本构方程的选择、砂井地基等效转换、分析荷载步的确定、竖向排水体的界定、地下水下降的处理、密封帷幕的处理、附近补充水源的处理等问题。 | | 4. | The mechanics of vacuum preloading was discussed by contrast of vacuum preloading and heaped preloading . the factors affecting the result of vacuum preloading for ground consolidation were as follows : the geological conditions of site , the intensity of vacuum pumping , the condition of underground water and installation of vertical drainage line . through analysis of these factors , some conceptions and design principles were proposed for vacuum preloading 在此基础上,通过堆载预压与真空预压的对比阐述了真空预压加固地基机理,分析了影响真空预压加固地基最终加固效果的各个因素:场地地质条件、抽真空作用强度、地下水赋存情况及竖向排水体的设置等。 | | 5. | A method to back analysis the distribution pattern of negative pore - water pressure along vertical drainage line was proposed . some practical vacuum preloading projects were analyzed . the results showed that distribution patterns of negative pore - water pressure along the vertical drainage line were uniform and the magnitude was about half of the vacuum degree under the membrane 提出由现场实测资料反分析竖向排水体中的负压分布的方法,通过对若干工程实例的反分析,认为真空预压下负压分布沿竖向排水体的分布基本均布,其值约在膜下真空度的50左右。 |
- Similar Words:
- "排水隧洞" English translation, "排水他" English translation, "排水台" English translation, "排水陶管" English translation, "排水特性" English translation, "排水体积" English translation, "排水体积中心" English translation, "排水条件" English translation, "排水通道" English translation, "排水筒" English translation
|
|
|