| 1. | Foundation consolidation grouting treatment of xin ' anjiang dam 新安江大坝坝基固结灌浆补强处理 |
| 2. | ( 2 ) the improvement of grid - based monthly hydrological model ( 2 )新安江网格化月水文模型的改进。 |
| 3. | Application of xinanjiang three waters model in puhe river basin 新安江三水源模型在蒲河流域上的应用 |
| 4. | Comparison of xin ' anjiang model with vertically - mixed runoff model 新安江模型与垂向混合产流模型的比较 |
| 5. | Chronological of events 1976 successfully installed the first elevator in shanghai 1976年在上海成功安装第一台新安江电梯 |
| 6. | Application of particle swarm optimization to parameter calibration of xin ' anjiang model 粒子群算法在新安江模型参数优选中的应用 |
| 7. | Design and construction of grouting reinforcement to the dam body of xinan jiang hydropower station 新安江水电站坝体补强灌浆设计与施工 |
| 8. | For the implementation of the concepts , the xinanjiang hydrologic model has been used 考虑到模型概念的可完成性我们使用了新安江模型。 |
| 9. | The method is tested using xin ' anjiang model to calculate the discharge hydrograph 并对抗差后的雨量资料采用新安江模型进行产汇流计算。 |
| 10. | Qiandaohu lake is located in the western part of zhejiang province in china 千岛湖位于浙江省西部,是1959年新安江大坝建成蓄水后形成的人工湖。 |