English translation for "施工图预算"
|
- a6-3
working drawing estimate
Related Translations:
水利工程施工: hydraulic engineering construction 施工队长: spread superintendent 施工准备: mobilizationpreliminary work for construction; preparations forpreparation of constructionpreparations for construction 施工编号: construction number 施工车辆: construction vehicle 施工监测: observation during and after construction 施工规程: construction regulations 铺面施工: pavement construction 施工技术: co truction technologyconstruction techniqueconstruction technologyengineering tchniquesengineering techniquesoperating technique
- Example Sentences:
| 1. | Probe into the necessity of drawing up construction budget by designing institute 浅谈设计部门编制施工图预算的必要性 | | 2. | Working drawing estimate 施工图预算 | | 3. | The important factors of compiling quality of highway engineering budget estimate and budget 提高公路工程施工图预算编制质量探讨 | | 4. | The third aspect is to reform current project price system and to engender market forming price system . this part has researched into our construction project price system and its disadvantages . pointing out to carry out project quantity bill quoted price and to push enterprise ration establishment and development 三是研究了我国现行建设工程价格的构成及其弊端分析,我国现行的工程造价是以定额为基础编制的施工图预算,以标底为核心,以百分制为主体的评标定标方法,这种价格制度难以体现竞争规律的要求。 | | 5. | Its main measures are : correct defining design - limited , ensuring accuracy of investment - appraised ; finishing works of optimally selected a tentative program - not exceeding investment - appraised ; by means of approved tentative program controlling design of constuction drawing ; concerning with investment of construction drawing not exceeding budget of tentative program ; managing changed - design , establishing assignment system of investment , reforming system of management of earning - way 其主要措施有:正确确定设计限额,保证投资估算的准确性;加强设计管理,重视方案选择,做好初步设计方案的优化和比选工作;严格按批准的初步设计控制施工图设计,保证施工图预算不突破批准的初步概算;加强设计变更的管理工作,控制不合理的设计变更;实行设计经济责任制,建立投资分配考核制,改进设计收费方法。 | | 6. | Currently , many problems are as follows : some people and engineers sometimes confuse or mistake so many conceptions and meanings of the price of construction product as to lead to troubles ; the cost of the construction product in the construction - auction - bid cannot be ascertained definitely ; the method of shop - drawing budget which is based on budget - ration cannot form effective market competition and market price of construction product . the management system of construction cost is not perfect 目前建筑产品价格及价格形成中存在以下问题:有关主管部门和少数工程人员有时混淆建筑产品价格相关概念及其内涵,产生诸多误解,以致造成工作上的摩擦;对建筑工程招标投标中建筑产品成本内涵界定不清晰;以预算定额为依据的施工图预算方式难以形成有效的市场竞争以及形成建筑产品的市场价格;当前未能形成完善的工程造价管理体制。 | | 7. | Abstract : considering the status quo , characteristics and prospects of decorative engineering including design , construction and contract and according to the current engineering cost supervision system and relevant policy , law and regulations in china , this paper introduces a method of budgeting for construction drawing of decorative engineering which can better meet the present - day needs 文摘:根据我国装饰工程在设计、施工、施工承包等方面的现状、特点和发展前景,结合我国现阶段工程造价管理体制和相关政策、法令、法规等,提出可能较好地适应现实需要的装饰工程施工图预算的编制方法。 | | 8. | The author considers as follows : ( 1 ) we should understand how to define the price of architecture products the cost of engineering and the price of engineering , we should compare the connotations of plan price , float price and market price , we should clarify how engineering cost and architecture installation engineering cost are formed and what is the difference between balance price and final accounts price ; ( 2 ) through analyzing and comparing the account bases and composing contents of enterprise individual production cost and social average production cost , analyzing from the design mechanism ' s function of auction and bid and the purpose of actualizing auction and bid , we can confirm that the foundation that the titles are weeded when judged is enterprise individual production cost , not social average production cost ; ( 3 ) the author considers there is diverge between shop drawing budget based on ration and auction and bid , carrying out bill quantity of construction works can advance the formation of cons truction - product market price , also is the outset and integrant route to close international , but though code of valuation with bill quantity of construction works has a lot of advantage to advance the form of architecture market price , we also see it has lack and it should be amended 针对以上问题,笔者认为:应该了解建筑产品价格与工程造价、工程价格是如何界定的、比较建筑产品的计划价格、浮动价格与市场价格的含义,搞清楚工程造价的构成和建筑安装工程费用的构成以及竣工结算价格与决算价格的区别;通过分析、比较建筑产品的“社会平均生产成本”和“企业个别生产成本”的计算依据和构成内容,从招标投标的设计机制的功能和实施招投标的目的来分析,确认在评标中剔除低于成本价标书的依据是投标企业的个别生产成本,而不是社会平均生产成本;笔者认为以定额为计价依据的施工图预算方法与招标投标之间存在悖论,工程量清单计价的推行是对建筑产品市场价格形成改革的推进,也是建筑产品价格形成方式与国际接轨的开端与必经之路,但是也必须认识到虽然《建设工程工程量清单计价规范》具有推进建筑市场价格形成的诸多优势,但仍存在不足与需要完善的地方。 | | 9. | The real estate development cost control methods are specified of decision , design , execution stage to reduce the construction cost , and it is compiling feasibility study report and capital invest estimation in decision , optimizing the design scheme and designed rationally in the technique and construction drawing design stage , electing rational construction scheme in construction stage , controlling the change in the work and field visas strictly , examining and approving budge detailed , budge planning use the quantities list , electing the best subcontractor , preventing some monopoly raise the price , collecting the detailed data in the fieldwork , making strict bargain 讨论了房地产开发项目的决策阶段、设计阶段、实施阶段分别需要采取的相关措施和方法,以尽量降低项目的工程造价,即在决策阶段编写详细的可行性研究报告和编制投资估算;在设计阶段优化设计方案,进行合理的技术设计和施工图设计;在实施阶段选择合理的施工方案,严格控制工程变更和现场签证,严格审核工程施工图预算,工程造价的预算采用工程量清单报价,择优确定专业分包单位,防止少数垄断性行业任意抬价,深入现场,收集和掌握施工有关资料,制定严密的合同条款。 | | 10. | First of all , because of the presence of duality economy , according to the fashion of the construction auction - and - bid and the computing fashion of construction cost , there are two modes , that is inviting public bidding in shop drawing budget and in the technique of calculating price of bills of quantities 本文研究主要内容是经济体制转型时期工程量清单招标实施方案和工程实物量清单招标的实施程序。首先,由于我国经济体制转型时期二元经济并存,导致在工程招标投标报价的方法也为二元模式:施工图预算招标、工程量清单招标。 |
- Similar Words:
- "施工图设计阶段" English translation, "施工图设计人员" English translation, "施工图设计总成" English translation, "施工图审查和提供设计改进的建议" English translation, "施工图审查有关报表" English translation, "施工图纸" English translation, "施工维修区" English translation, "施工文件" English translation, "施工误差" English translation, "施工现场" English translation
|
|
|