English translation for "横隔梁"
|
- diaphragm
Related Translations:
横隔: tabula; telophragma◇横隔膜 diaphragm; transeptae; 横隔片 [植物学] trabeculae
- Example Sentences:
| 1. | With the x-frames projecting into the boxes, the transverse diaphragms were formed . 把这些X框架放进这些箱体,就成了横隔梁。 | | 2. | Diaphragm , design of metal - clad post - frame rectangular buildings 包金属的柱式框架矩形建筑物的结构和横隔梁 | | 3. | With the x - frames projecting into the boxes , the transverse diaphragms were formed 把这些x框架放进这些箱体,就成了横隔梁。 | | 4. | 4 . the side girders , the deck and the lateral beams of the cable - stayed structure are cast - in - place at one time 4 、金马大桥在施工过程中采用边主梁、横隔梁和桥面板三部分分阶段一次现浇。 | | 5. | In addition , the main stress at the interface of the bottom flange and inclined web , which located at the interface with the diaphragm , is the largest . so , it should be taken more attention to them in design 另外,横隔梁与斜腹板及底板交界处的底板及斜腹板区域,其主应力数值最大,设计中应给予重视。 | | 6. | Based on the above , the three dimensional stress of the box girder with different dimensions are analyzed . by analyzing the result of above seven working situation , some conclusions are given out . the main tensile stress of in diaphragm is very large 通过对以上七种工况计算结果的分析,认为在双箱单室箱形主梁中,横隔梁中产生的主拉应力很大,受力极为不利。 | | 7. | In order to considering the affections of the adjacent zone out of the girdler section , the internal - forces of two end surface which were obtained by the horizontal shaft system analysis are exerted on each model respectively . moreover , the weight , cable force and prestressing forces including girder longitudinal , diaphragm transverse and inclined web vertical directions are considered 考虑到梁段以外附近区域的作用,在其两端面上施加了由平面杆系结构分析所得的端面内力,另外,索力和预加力(梁纵向、横隔梁横向、斜腹板竖向)也施加在相应的位置,分析了箱形主梁在自重、索力和预应力作用下的空间应力效应。 | | 8. | Some experts once suspected that the reserve pre - stresses in the lateral beams are not enough . in order to settle this problem , three construction schemes are analyzed comparatively . the results indicate that the pre - stresses in the lateral beam are acceptable and tensioning the reinforcements by two steps is the appropriate method both for the girder and the lateral beam 针对这一问题,本文采用三种施工方案进行对比计算分析,结果表明横隔梁中的预应力储备是满足要求的,而且金马大桥采用的这种横隔梁力筋分批张拉的施工顺序使该桥边主梁及横隔梁的受力都较为合理。 | | 9. | Reasons : firstly , sectional dimension is so little that torsional stiffness of single - beam is n ' t enough . secondly , protective layer thickness is too thin to protect concrete reinforced bar and reduce durability . lastly , each main beam is joined by cross girder and the more rigid of cross girder the more entirety of bridge 桥梁局部损坏较严重,主要原因是主梁截面尺寸过小、肋板过于薄弱,造成单梁抗扭刚度不足;保护层厚度不够导致钢筋外露引起锈蚀,降低了桥梁的耐久性;各主梁采用横隔梁连接成整体,横隔梁的刚度越大,桥梁的整体性越好,但调查结果显示,实际情况中并不能达到理想的整体刚度。 |
- Similar Words:
- "横隔舱壁板" English translation, "横隔齿列的" English translation, "横隔堵" English translation, "横隔浮标" English translation, "横隔筋" English translation, "横隔面" English translation, "横隔膜" English translation, "横隔膜;隔脊" English translation, "横隔膜的" English translation, "横隔膜肌肉部分" English translation
|
|
|