Mobile
Log In Sign Up
Home > chinese-english > "水平分层" in English

English translation for "水平分层"

horizontal slice
horizontal stratification
horizontalslice
Example Sentences:
1.Horizontal layering is a prerequisite for the application of geoelectric master curves .
水平分层是应用电量板的先决条件。
2.Method of dehydration in working face of steeply - inclined horizontal slice
急倾斜水平分层工作面脱水方法
3.Specifies a hatch that has the appearance of horizontally layered bricks
指定具有水平分层砖块外观的阴影。
4.Flat back cut and fill method
水平分层充填开采法
5.The upward horizontal slice stoping and filling without intervening pillar is the main mining method in huangshaping pb - zn mine
摘要上向水平分层充镇无间柱采矿法是黄沙坪铅锌矿的主要采矿方法。
6.Working conditions and productive capacities of both drill carrier and carry - scraper used during mechanical cut and fill stopping activities in xinqiao mining cooperation ltd . are evaluated by field testing and theoretical analysis in this paper
摘要以新桥矿业有限责任公司大型机械化上向水平分层充填采矿法中使用的凿岩台车和铲运机为研究对象,通过现场测定和理论分析相结合,评价了无轨设备的应用状况和生产能力。
7.Fabrication of the box beam is divided into such parts as reinforcement , formwork , concreting , prestressing , moving and storing of beam , pipe grouting under pressure , end sealing of the beam , water - proof layer on the bridge surface system , protective coating etc . the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects , such technologies as : manufacturing and fixing of reinforcement , steel reinforcement fixing baseplate , web plate and top plate respectively and lifting the steel skeleton into form , requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork , optimization of concrete ratio , concrete pouring process of two ends of beam in priority over the middle , in sequence of first baseplate followed by web plate and top plate at last , concrete pouring in inclined section and in horizontal layer , concrete vibration mainly by external vibrator in assistance with internal vibrator , methods and regulation for steam curing of concrete , dual controls over stress and strain to ensure quality of prestressing workmanship , construction method of effective beam moving by heavy - weight special moving facility , some regulations and key notes about construction of grouting under pressure , beam ends sealing , water - proof layer on the bridge surface system , protective coating
箱梁制造由钢筋工程、模板工程、混凝土工程、预应力工程、移存梁工程、孔道压浆工程、梁体封端工程、桥面防水层和保护层工程等施工环节组成。文中介绍的采用胎具制作和绑扎钢筋,分底腹板和顶板分别绑扎并吊装钢筋骨架入模;拆装式和液压式两种模板的设计、制作要求和使用方法;综合考虑、优化混凝土配合比,混凝土灌注从两端至中间、先底板、后腹板、再顶板的施工顺序和斜向分段、腹板水平分层、附着式振捣为主、插入式捣固为辅的施工工艺,蒸汽养护的方法和规定;应力应变双控制确保预应力施工质量的施工技术;采用重物移运器有效移梁的施工方法;压浆、封端、桥面防水层和保护层施工的一些规定和注意事项等都是对箱梁制造行之有效的施工技术和施工方法,并可为以后类似施工作借鉴。
8.Three finite - difference methods , i . e . , stagger grid , implicit and explicit algorithms , are analyzed in detail . multi - grid algorithm is firstly introduced in elastic wave simulation , to solve for the stability problem inherent in stagger grid and implicit algorithm , also for the efficiency problem inherent in explicit algorithm , and the precision , stability and efficiency for simulation of elastic wave arc increased by multi - grid method . phase - delay method is provided to effectively absorb boundary reflection and increase efficiency for wave motion simulation , based on phase delay and amplitude decaying features along wave propagation
水平分层介质接收函数的波形反演研究的基础上,本文系统阐述了非均匀介质中弹性波传播数值模拟常用的三种有限差分方法:显式差分、隐式差分和交错网格法,首次将多重网格算法应用于弹性波方程的数值模拟问题,克服了交错网格法和显式差分法稳定性差,以及隐式差分法计算效率低的缺点,大大提高了弹性波数值模拟的精度、稳定性和计算效率。
9.By means of a detailed analysis to the interaction between droplet and its carrying fluid for horizontal stratified / atomization two - phase flow , a theoretical model is proposed to calculate the droplet axial velocity profile and the relative slip between dispersed phase and continuous phase
摘要通过对水平分层雾化流中液滴和其携带流体间交互作用的分析,提出了一个预则水平分层雾化流中轴向液滴速度分布以及弥散相和连续相之间相对滑移的理论模型,通过计算获得了两相速度参数及相对滑移参数。
10.With the mining of no . 1 ore body which is solwly inclined , large and thick at the west flank of xinqiao pyrite mine as the example , analytic comparision is made between flat - back cut and fill stoping and sublevel open stoping with one - time delayed filling . the suggestion on the optimization of the mining and the discussion on appropraite mining method and the technical parameters of mining technology for slowly inclined large and thick ore body are also made
以新桥硫铁矿矿体西翼缓倾斜厚大矿体的开采为实例,对生产中应用的水平分层充填采矿法和分段空场嗣后一次充填采矿法进行分析比较,提出采矿方法的优化建议,探讨缓倾斜厚大矿体合适的采矿方法和采矿工艺技术参数。
Similar Words:
"水平分辩力检验楔" English translation, "水平分布" English translation, "水平分布处理" English translation, "水平分布处理系统" English translation, "水平分布式系统" English translation, "水平分层充填采矿法" English translation, "水平分层充填法" English translation, "水平分层充填开采法" English translation, "水平分层方框支架采矿法" English translation, "水平分层开采法" English translation