Mobile
Log In Sign Up
Home > chinese-english > "水库淤积" in English

English translation for "水库淤积"

reservoir deposits
reservoir sedimentation
reservoir silting
sedimentation of reservoir
silting of reservoir


Related Translations:
淤积面积:  area of deposition
水库构筑物:  reservoir structures
三峡水库:  the three georges reservoir
甸水库:  flood control reservoir
联合水库:  suedinenie yazoviryazovir suedinenie
牛顿水库:  newton res
牙水库:  coilfang reservoir
清河水库:  qinghe sk
水库水位:  basin levelpool levelreservoir level
沙草坪水库:  sachopyong josujisachopyong-josuji
Example Sentences:
1.Preliminary analysis of dry density of silted material in tgp reservoir in initial period
三峡水库淤积物初期干容重试验初步分析
2.Study on distribution and calculation method of reservoir sediment dry bulk density
水库淤积泥沙干容重分布规律及其计算方法的研究
3.The paper also advances some opinion and measures based on runoff characteristic to improve the reservoir operation , and then analyses the corresponding results
针对流域径流特点,按照增加水库调节水量,提高供水效益,减缓水库淤积发展的要求,提出了水库运用方式的改进意见和措施,并对其效果进行了分析。
4.For studying the regulation rules of the sediment of the second phase project , and studying the reservoir capacity loss caused by deposition , the amount of sediment passing through the turbines , and the deposition and flow regime near the intake of the pump - turbines , the deposition of the reservoir was studied
为了研究蒲石河抽水蓄能电站二期工程泥沙调度方案,对多个方案的水库淤积损失、过机沙量、取水口附近的泥沙淤积和水流流态,进行了水库冲淤研究。
5.Firstly , we account for the former made and the sand selected are reasonable by experiments . then we develop the first project carrying the experiment for filling up of 30 years . contrasted with the count , the results have no difference , we carried two experiments under different water levers by the actually facts if engineering work in early days . by the result , we know that the gross of fill up have no difference
本文从白石水库泥沙模型试验入手,模型试验首先通过模型糙率和模型选沙验证试验,说明模型制作和选沙是合理的;然后开展初设方案30年运用水库淤积试验,并与数模计算对比,基本相同;试验结合工程初期运用实际情况,进行了两个不同初期运用水位方案的对比试验,从两个方案试验结果看,初期运用的两个方案淤积总量差别不大,而从效益看,方案二优于方案一。
6.In this paper , the deposition evolution process in qtx reservoir are studied , the incoming water and sediment , the operation data , and the time and space distribution of longitudinal and lateral sedimentation in reservoir are analyzed in detail , and the longitudinal scouring and sedimentation and lateral deformation law in reservoir tidal flat and mainstream under different operation way are summarized in every operation period
本文以黄河青铜峡水利水电枢纽工程水库淤积演变过程为研究对象,对青铜峡水库来水来沙组成、水库运行资料、水库纵横向泥沙淤积时空分布等进行了较详细的分析,总结了青铜峡水库各个运行时期不同运行方式下水库滩槽纵向冲淤和横向变形规律。
7.The task of the paper is analysis the cause and trend of reservoir sedimentation based on the study of runoff characteristic , operation mode and sediment status of xiazhai reservoir in xiji county , so as to offer a theory basis to confirm reasonable reservoir operation mode and to perfect the desig n of the works , and to provide a certain guidance to solve the practice problem of other water works
本课题以西吉县夏寨水库为研究对象,通过研究水库径流特征和水库运行方式及淤积状况,分析了水库淤积成因及变化趋势,为合理确定水库运行方式,进一步完善工程设计提供了理论基础,对解决工程实际问题具有一定指导意义。
8.According to the fact of the engineering , the optimal modeling when fenhe first reservoir operated alone are first made . after getting the regularity , in order to consider fenhe second reservoir that had been finished essentially and shanxi wanjiazhai yellow river diversion project , not only the object of minimum water shortage for satisfying the water use demanded mainly by user are founded , but also the object of minimum the reservoir deposition was found . in order to prevent the water use demanded by city and industry from excessively concentrated water shortage , the object of minimum water shortage required to be the equable shortage
本文在对来水分析基础上,对太原市需水库供水的用水进行了预测,结合工程实际,先对汾河一库单独运行时进行优化模拟,得出规律后,考虑已基本完工的汾河二库及引黄南干工程,建立了以满足用户用水为主要目标的“缺水量最小”目标和减少水库淤积的“水库淤积量”最小的目标,其中“缺水量”最小目标要求是均匀的短缺,避免过分集中而影响了城市及工农业用水。
9.The paper starts with the reservoir sedimentation , operation mode and catchment runoff characteristics . the study comprises of distributing of runoff and sediment in the catchment , the influence and trend of sedimentation and water storage under different operation mode
课题研究主要从水库淤积状况、运用方式和流域径流特征分析入手,阐述了流域径流、泥沙时段分布,研究了不同运用方式下水库冲淤的主要影响因素及变化趋势,分析了不同运用方式时水库淤积情况和拦蓄水量。
Similar Words:
"水库养鱼" English translation, "水库夜歌" English translation, "水库移民" English translation, "水库溢洪道" English translation, "水库诱发地震" English translation, "水库淤积测量" English translation, "水库淤积计算" English translation, "水库淤积量" English translation, "水库淤积年限" English translation, "水库淤积速度" English translation