| 1. | Controlled blasting excavation technique of permanent lock of three gorges project 三峡永久船闸开挖控制爆破技术 |
| 2. | Reinforcement effects and construction key techniques of two - ended anchors of tgp shiplock 三峡永久船闸对穿锚索施工关键技术及加固效果 |
| 3. | Analysis on monitoring results of locked anchor - bar stress at tgp permanent lock s vertical slope 三峡永久船闸直立坡锁口锚杆应力监测分析 |
| 4. | Installation process of the miter gate of permanent navigation in the three gorges project continuation 三峡永久船闸人字门安装工艺措施简述续二 |
| 5. | Multiple - index assessment for global stability of high - steep rock slope of the three gorges project permanent shiplock 三峡永久船闸高陡边坡整体稳定性的多因素综合评价 |
| 6. | Numerical simulation on crack propagation and reinforcement effectiveness of isolated rockmass between shiplocks of three gorges project 三峡工程永久船闸中隔墩裂缝扩展及加固效果数值分析 |
| 7. | Its permanent shiplocks was established and put into use in june , 2003 and its ship - lifting elevator would be accomplished in 2009 其永久船闸已在2003年6月建成投入运行,升船机预计在2009年建成。 |
| 8. | Hydralics monitored findings in the water - pumping debugging period for tgp lock are presented and compared with model test data 摘要介绍了三峡永久船闸抽水调试阶段水力学监测的部分成果,并与模型值进行了比较。 |
| 9. | The article introduces the waterproofing and drainage measures and materials for the dam , the foundation of the permanent lock and some buildings of the three gorges project 介绍了三峡工程中大坝、永久船闸基础及一些建筑物的防排水措施和所用材料。 |
| 10. | In this paper , studies are profoundly made on the actual detecting problems happened in the topic of " acoustic emission monitoring of the slope stability of the permanent ship lock for the three gorges " 本文在“长江三峡永久船闸边坡稳定性声发射监测”课题基础上及实际检测中面临的问题进行较深入而有针对性的研究。 |