| 1. | In 1969 a (51mm) bituminous concrete overlay was placed on the concrete deck . 1969年在混凝土板上铺设了51mm厚的沥青混凝土铺装层。 |
| 2. | Asphalt concrete data processing system based on vb 沥青混凝土数据处理系统 |
| 3. | Test and research on asphalt concrete core of rock fill dam 沥青混凝土防渗墙施工技术 |
| 4. | Crack self - healing tests of asphalt concrete 沥青混凝土的裂缝自愈试验研究 |
| 5. | The proportion design of modified asphalt concrete 北美岩沥青改性沥青混凝土配合比设计 |
| 6. | Research on the polymer fiber modified asphalt mixture 聚合物纤维改性沥青混凝土的研究 |
| 7. | Control of level of sbs asphalt concrete road 沥青混凝土路面平整度的控制 |
| 8. | How to increase the evenness of bitumen concrete pavement 如何提高沥青混凝土路面平整度 |
| 9. | Construction of rockfill dam with asphalt concerte core wall 沥青混凝土心墙堆石坝的施工 |
| 10. | Design of small - sized traction asphalt - concrete spreader 小型牵引式沥青混凝土摊铺机的设计 |