| 1. | The study on oily sludge coking process 焦化法处理含油污泥工艺流程研究 |
| 2. | 16 17 completed the first phase of the earthmoving works in 基围16 17第一阶段推泥工程已经完成 |
| 3. | Test study on engineering properties of dredging soil of west lake in hangzhou 杭州西湖疏浚底泥工程性质试验研究 |
| 4. | Work will continue until the end of october when the wintering waterbirds return 挖泥工泥将进行至10月底,直至越冬雀鸟回归。 |
| 5. | Research and improvement of fine cleaned coal desliming technology for coal preparation plant 选煤厂末精煤脱泥工艺的研究与改造 |
| 6. | 16 17 was finished in mid - july and the pond has now been re - filled with water 基围16 17第一阶段推泥工程已于七月中完成,并已重新注水。 |
| 7. | Retaining wall no . 45 at cheung sha has been completed and backfilling below south lantau road has commenced 位于长沙的挡土墙编号45已完成与及开始位于屿南道以南的回泥工程 |
| 8. | 4 for dredging works , only mechanical dredgers with bucket - type closed - grabs shall be used for the dredging of river bed or ponds 进行挖泥工程时,只可使用密封抓斗式的机械挖泥机,以挖掘河床或塘底的淤泥。 |
| 9. | The objectives of marine parks are to protect , enhance and restore marine life and environment and provide a refuge from dredging . chinese white dolphin in hong kong needs urgent protection 设立海岸公园的目的是保护和增加海洋生物,修复海洋环境,以及令区内的海洋环境免受挖泥工程的威胁。 |
| 10. | So far , dredging works and dumping of mud have been conducted in accordance with the statutory provisions and recommendations in the eia report to mitigate environmental impacts to acceptable levels 直至目前为止,挖泥工程及卸泥工程都是按照环评报告内的法定条文及建议进行,把对环境构成的影响减至可接受水平。 |