| 1. | Heat pumps ; absorption heat pump units ; performance and operational tests 热泵.吸热泵设备.性能和运行试验 |
| 2. | Commercial and industrial unitary air - conditioning and heat pump equipment 商用和工业用统一空气调节和热泵设备 |
| 3. | Drain and sewer systems outside buildings . part 6 : pumping installations 建筑物外部排水和污水系统.第6部分:泵设备 |
| 4. | Methods of testing for rating electrically driven unitary air - conditioning and heat pump equipment 电动整体空调和热泵设备的额定值试验方法 |
| 5. | Drain and sewer systems outside buildings - part 6 : pumping installations ; german version en 752 - 6 : 1998 建筑物外部排水和污水系统.第6部分:泵设备 |
| 6. | The good heat exchange environment and the suitable operation method can save energy greatly 并且注意热泵设备的运行换热环境和恰当的运行措施。 |
| 7. | Gas - fired absorption and adsorption air - conditioning and or heat pump appliances with a net heat input not exceeding 70 kw - part 2 : rational use of energy 净热输入值不超过70kw的燃气吸收和吸收式空调和或热力泵设备.第2部分:能量的合理使用 |
| 8. | The design shall be such that the pumping units will be automatically connected to the discharge piping when lowered into place on the discharge connection 这种泵设备应该具有这样的性能,当泵设备的排泄口放置在排泄管连接处时,能够自动进行连接。 |
| 9. | Your client can choose one of them if he is merely seeking low initial cost and is not concerned about long life and reliable operation 如果仅仅考虑比较低的初始购置成本,而不关心较长的泵使用寿命和运行的稳定可靠的用户,不适合选购美国约曼的泵设备。 |
| 10. | Rebar and anchor bolts used in the pump base shall be sufficiently tied to the mounting floor to ensure a rigid , stable mounting surface for the pump unit 泵基座所采用的钢筋和锚固螺栓应该能够与安装地面结合牢固紧密,确保为泵设备提供坚固可靠的安装基础。 |