| 1. | Design speifications for concrete face rockfill dams 混凝土面板堆石坝设计规范 |
| 2. | Specifications for concrete face rockfill dam construction 混凝土面板堆石坝施工规范 |
| 3. | Construction specification for concrete faced rockfill dams 混凝土面板堆石坝施工规范 |
| 4. | Cfrd monitoring and its behavior analysis 混凝土面板堆石坝监测及性态分析 |
| 5. | Design code for concrete face rockfill dams 混凝土面板堆石坝设计规范 |
| 6. | Study on rock - fill dams with concrete face in cold conditions and its application 严寒地区混凝土面板堆石坝施工技术的研究与应用 |
| 7. | Concrete face rockfill dam ( cfrd ) is a new type of dam with very developing future 混凝土面板堆石坝是极有发展前途的一种新坝型。 |
| 8. | Trial production blasts of the rock filling materials for shuibuya concrete face rockfill dam 水布垭混凝土面板堆石坝填筑料开采爆破试验 |
| 9. | The concrete face rockfill dam of lianhua hydropower station is the first large scale face rockfill dam in the cold region in china at present 莲花水电站建设的混凝土面板堆石坝,是目前我国在寒冷地区修建的第一座大型面板堆石坝。 |
| 10. | Construction and operation of the concrete faced rockfill dam which is located in the cold area differs from others because of special conditions 位于寒冷地区的混凝土面板堆石坝,由于外部环境存在差异,使得面板坝的实施和运行有所不同。 |