| 1. | Grouting test of 6 tunnel in the south main line of yellow river division project 引黄工程南干线6号隧洞灌浆试验 |
| 2. | Inspection of xiluodu hydroelectric power station dam foundation consolidation grouting test 溪洛渡水电站坝基固结灌浆试验检测 |
| 3. | Curtain grouting test for replacing seepage prevention wall of stage i soil - rock cofferdam of tgp 三峡工程一期土石围堰以幕代墙灌浆试验 |
| 4. | Application of high - pressure jet grouting test in consolidation works of quting reservoir 高压喷射灌浆试验在曲亭水库除险加固工程中的应用 |
| 5. | Test process of consolidation grouting without ballast in dam foundation of goupitai hydropower station 构皮滩水电站坝基无盖重固结灌浆试验工艺 |
| 6. | Experimental research on grouting soft rock foundation under toe slab of siping concrete faced rockfill dam 寺坪面板堆石坝趾板软岩基础灌浆试验研究 |
| 7. | Design and construction of the chemical grouting for the shale rock dam foundation of the xinanjiang hydroelectric project 新安江水电站坝基页岩化学灌浆试验设计与施工 |
| 8. | For checking the availability and rational of the computing program , the grouting test in - situ of the xiluodu hydroelectric project were simulated and computed , and also simulated the next conditions which the result of the grouting test will be used in 为检验所编程序的合理性和适用性,对溪洛渡工程的现场固结灌浆试验进行了模拟计算,并对灌浆试验成果将来运用情况进行了补充模拟计算。 |
| 9. | 5 . there are 979 . 32 meter long to the curtain of the xiangshuiriver reservoir include 879 . 32 meter " s long double row curtain ( about 92 percent ) in the original design . by optimizing the design according to the grouting test , the double row curtain was cut down to 245 . 66 meter length ( 25 per cent of them ) , the density of the bore hole have from 0 . 81m / m2 reduced to 0 . 64m / m2 . total save 4 . 47 million rmb cost of the project 5 、在总长为979 . 32m长的帷幕段中,初设批复方案的双排帷幕总长为879 . 32m ,占帷幕总长的92 % ,根据灌浆试验研究成果优化设计后,双排帷幕长度减少至245 . “ m ,仅占帷幕总长度的25 % 。 |
| 10. | ( 4 ) one row seepage wall , which is formed by sprinkling grouting method , is used to the xiacouba reservoir project for cutting off the way of seepage on the basis of the project condition and grouting test . the results testified that a sound effectiveness of preventing seepage could be attained by the application of the high - pressure sprinkling grouting technology if design paramenter is proper and the construction quality is controlled strictly 根据工程要求、 _仁质条件及灌浆试验,本工程选用单排旋喷套接的方式形成防渗墙,实践证明,只要设计参数合理,施工过程严格控制,利用高压喷射灌浆技术可达到防渗、堵漏的目的。 |