Abstract : the paper describes in detail the construction technology ofelastic monolithic track bed at extra - long qinling tunnel , i . e . , selection of material , quality control , preparation and casting of track bed concrete , as well as some points for attention during construction 文摘:较为详细地介绍了秦岭特长隧道弹性整体道床施工技术,包括弹性整体道床用料的选择,施工机具的选型,施工工艺及质量控制,道床混凝土制备、灌筑,以及施工注意事项等。
2.
The construction of the bridge began in oct 1999 , and the closing up of the steel tube was in dec 2000 . during that period , i learned and analyzed the current construction methods fairly comprehensively , and collected the construction technique data of the cfst arch bridges having been built . based on this , aided by the simulation of construction procedure using finite element program , i proposed the operation program to make the steel tube segment be located at one time , and the scheme of dividing rooms to segment pouring 大桥于99年10月开工, 2000年12月主桥钢管合龙,在此期间,本人就目前钢管混凝土拱桥的施工方法进行了较全面的了解和分析,搜集了此类已建桥梁的施工技术资料,在此基础上,又借助有限元程序对施工过程模拟计算的支持,提出了在梅溪河大桥悬臂安装过程中,钢管节段一次就位的操作程序和钢管混凝土分仓灌筑的方案,并为施工单位采纳应用。