| 1. | Both gezhouba project and three gorges dam are built in yichang 葛洲坝工程和三峡大坝都处在宜昌。 |
| 2. | Inperial - court hotel inperial - court hotel 葛洲坝宾馆 |
| 3. | Structural dynamic analysis on head cover of gezhouba water turbine set 葛洲坝水轮机组顶盖结构动力分析研究 |
| 4. | Inperial - court hotel : hubei hotels - china hotel hubei hotel reservation 葛洲坝宾馆:湖北饭店-中国饭店湖北饭店订房网 |
| 5. | A study on algorithm for lock head floor of shiplock of separately casted floor and piers 谈葛洲坝三号船闸的安全检查问题 |
| 6. | Water - level fluctuation of the reservoir region since the operation of the gezhouba project 葛洲坝水利枢纽运行以来库区水位变化 |
| 7. | Reinnovation of erjiang discharging sluice automatic monitoring system at gezhouba project 葛洲坝二江泄水闸自动监测系统更新改造 |
| 8. | Inperial - court hotel 葛洲坝宾馆 |
| 9. | Research on mooring arrangement scheme for floating repair gate of ship lock at gezhouba project 葛洲坝船闸浮门浮式系泊装置方案研究 |
| 10. | Mixed - integer programming to navigation co - scheduling of the three gorges dam and the gezhouba dam 三峡葛洲坝联合通航调度的混合整数规划 |