Mobile
Log In Sign Up
Home > chinese-english > "衬砌墙" in English

English translation for "衬砌墙"

lining wall

Related Translations:
砌墙:  build a wall◇砌墙石 bonder
浆砌墙:  mortar walling
砌墙泥:  pise
砌墙工:  bricklayer
砌墙石:  bonding header
转砌墙:  masonry wall
干砌墙:  dry stone walldry wallingdry-laid masonry wall
乾砌墙:  mortar less wall
希腊式砌墙:  greek masonry
自动砌墙机:  automason
Example Sentences:
1.Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given , which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam , dumping bottom technique of river closure in deep water , construction of cut - off walls in the second stage earth - rock cofferdams , 3 - d computer simulation of river closure , concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete , deep sliding resistance and stability of the intake dam section , the section of the intake of the power station , the intake penstock of the power station , layout and hydraulics problems of shiplocks , stability of high slopes of shiplocks , and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
文摘:介绍三峡工程的科研项目,综述三峡工程开工以来的主要科研成果及工程应用情况,包括:一期土石围堰基础处理与施工技术;大江截流上下游土石围堰平抛垫底研究;二期围堰防渗工程研究;大江截流计算机科学管理;大坝混凝土浇筑方案及主要施工机械选型;混凝土的原材料和耐久性优化试验研究;大坝基础深层抗滑稳定研究;三峡电站进水口型式研究;钢衬钢筋混凝土引水管道研究;蜗壳打压、厂坝间伸缩节问题研究;永久船闸的引航道布置、输水系统及水力学、高边坡稳定、混凝土衬砌墙的结构与支护研究;特大型水轮发电机组的科学研究。
2.A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given , which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam , dumping bottom technique of river closure in deep water , construction of cut - off walls in the second stage earth - rock cofferdams , 3 - d computer simulation of river closure , concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete , deep sliding resistance and stability of the intake dam section , the section of the intake of the power station , the intake penstock of the power station , layout and hydraulics problems of shiplocks , stability of high slopes of shiplocks , and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
介绍三峡工程的科研项目,综述三峡工程开工以来的主要科研成果及工程应用情况,包括:一期土石围堰基础处理与施工技术;大江截流上下游土石围堰平抛垫底研究;二期围堰防渗工程研究;大江截流计算机科学管理;大坝混凝土浇筑方案及主要施工机械选型;混凝土的原材料和耐久性优化试验研究;大坝基础深层抗滑稳定研究;三峡电站进水口型式研究;钢衬钢筋混凝土引水管道研究;蜗壳打压、厂坝间伸缩节问题研究;永久船闸的引航道布置、输水系统及水力学、高边坡稳定、混凝土衬砌墙的结构与支护研究;特大型水轮发电机组的科学研究。
Similar Words:
"衬砌块" English translation, "衬砌裂损" English translation, "衬砌模架" English translation, "衬砌耐火砖的" English translation, "衬砌剖面" English translation, "衬砌渠道" English translation, "衬砌隧道" English translation, "衬砌隧洞" English translation, "衬砌台车" English translation, "衬砌修复" English translation