| 1. | Specification for thermal spray equipment acceptance inspection 热喷涂设备验收检验规范 |
| 2. | Acceptance specification of packaging equipment for liquid food 液体食品包装设备验收规范 |
| 3. | Specification for acceptance of low voltage switchgear assemblies 低压成套开关设备验收规程 |
| 4. | Acceptance regulation of equipment repair quality 设备验收交接制度 |
| 5. | Thermal spraying . acceptance inspection of thermal spraying equipment 热喷涂.热喷涂设备验收检验 |
| 6. | New equipment manufacture following up and the machine receive and commission 新设备的制造跟踪,设备验收及调试 |
| 7. | H . one original equipment acceptance certificate signed and affixed by the end - user and the seller 由最终用户和卖方签章的设备验收证书正本一份。 |
| 8. | We participated in constituting the national standard of check and accept for food packaging machine in 2003 2003年参加国家技术监督局液体食品包装设备验收规范国家标准制定。 |
| 9. | 2 a guarantee period of 12 months shall start from the date of equipment acceptance certificate or 14 months start from the date of b / l , whichever comes earlier 质保期应为设备验收证书签署之日起12个月,或海运提单日后14个月,以先到者为准。 |