Mobile
Log In Sign Up
Home > chinese-english > "试验桩" in English

English translation for "试验桩"

test pile
trial pile


Related Translations:
桩排:  row of piles
拉力桩:  tension pile
立标桩:  stake-settingstaking
桩顶:  pile bolckpilebolck
套管桩:  case pilecased pile
桩头:  pile crownpile head=buttpile toepilecrownpilehead
桩冠:  dowel crownpost crown, pivot
短粗桩:  stub pile
尖桩:  picket
马桩:  hitching post
Example Sentences:
1.Set the lmrp on the test stump
将隔水管下部插入总成放到试验桩上。
2.Test the bop stack on the stump
试验桩上试验防喷器组。
3.Set the bop stack on the stump and close the hydraulic connector , and then secure it
将防喷器组吊坐到甲板试验桩上、关液压爪形连接器,并固定。
4.Considering the engineering of trail pile in hubei jingzhou yangtze river highway bridge , the construction process of deep cast - in - place pile under pebble geological structure , the limit load - bearing capacity of single pile , side friction stress and head drag are researched in this thesis deeply
论文结合湖北省荆州长江公路大桥的试验桩工程,深入研究了江汉平原地区卵石地基深钻孔灌注桩的施工工艺、单桩极限承载能力、桩侧摩阻力和端阻力。
5.In this thesis , the technological way that prevent the anchorage pile and the concrete of anti - force beam from crazing , and the technological application of ultrasonic determine apparatus to detecting are introduced during engineering of trial pile by inducting prestressed technology to anchorage pile and anti - force frame
论文还介绍了在试验桩工程中,通过预应力技术引入锚桩及反力梁系统,防止锚桩和反力梁混凝土开裂的技术途径,和超声波侧壁测定仪检测技术的应用。
6.In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock . the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002 , tb 10002 . 5 - 99 , jtj024 - 85 and jgj94 - 94 , then the design method with correlated formula of socketed piles in xigeda - mudstone is given . at the end of this paper , based on the research of pressure grouting technique in recent years , and combined with in - site test result , this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters , which provid es experiences for applying this technique and further studying
本论文结合省级科研项目“西攀高速公路昔格达组泥岩层中钻孔桩提高承载力的研究” ,所做的研究工作主要在以下三个方面:一是根据8根桩身内埋设量测元件试桩的单桩竖向静载荷试验资料,分析了各试验桩特别是常规冲孔灌注嵌岩桩在昔格达泥岩中的轴向力、侧摩阻和桩端阻力的分布和发挥规律;二是在讨论现行规范对嵌岩桩承载力的计算公式的基础上,探讨了在昔格达泥岩层中的冲孔灌注嵌岩桩的侧摩阻和端阻的计算方法,并推荐了相应的计算公式;最后,在吸取近年来对灌注桩后注浆技术研究成果的基础上,结合现场试验研究结果,分析了该项技术在昔格达岩层中的应用效果,提出了相应的参数选取,从而为压力灌浆技术的工程应用和进一步研究提供经验,并为今后在该地层中合理选用桩型以及指导施工提供了依据。
7.The static loading test for three group of testing piles of jiading power plant secend stage project are analyzed and studied in this thesis , and the practical applying of high - accurate data collector , technique of waterproof insulation and testing technique of burying in the body of pile are introduced also . the vertical and horizontal loading features of three group of piles of different kind and constructing technique in different earth layer at the pile point are analyzed and compared and summed up with basic integro - differential equation calculating the pile earth system load transmit , transforming principle of stress - deforming and pile body rating of burying electric measuring element . changing law of stress , and changing law of pile body shifting and bending for different testing piles under vertical and horizontal load are showed so that the loading features of soil layer and pile at testing spot , reliable design data for pile type and base for scientific construction technique are provided
本文仅就嘉定电厂二期工程中的三根试验桩的静载试验进行了分析和研究,利用桩土体系荷载传递分析计算的基本微分方程及应力-应变转换原理,结合预埋电测元件的桩身率定,对三组不同种类、不同施工工艺、不同持力层中的桩的竖直、水平承载特性进行了分析、比较和归纳,通过大量、全面的实测数据,经过整理、转换和推演,揭示了不同试验桩在竖直、水平荷载作用下的应力变化规律和桩身变位、挠曲变化规律,最终提供试验场地土层和桩的承载特性,为该工程合理设计桩型提供了可靠的设计参数,为确定科学的施工工艺提供了有力的依据。
8.Abstract : the results of hi - lo strain - gauge test on 9 dead - load testing piles are analyzed . the bearing strength of single piles is evaluated preliminarily by using high strain and low strain process and conditions for correlating dynamic and dead loads and technical factors affecting the test accuracy are discussed
文摘:通过对一组静载试验桩高低应变动测结果的分析,对高应变法、低应变法检测单桩承载力的可靠性作出了初步评价,并对动静对比成立的条件及影响其测试准确性的一些技术因素进行了探讨。
Similar Words:
"试验铸块" English translation, "试验铸造车间" English translation, "试验住的" English translation, "试验住宅" English translation, "试验转炉" English translation, "试验桩记录仪" English translation, "试验装备" English translation, "试验装药" English translation, "试验装置" English translation, "试验装置,检定装置" English translation