| 1. | Connecting survey of the deepening of blind service shaft 盲副井延深的贯通测量 |
| 2. | Estimating the approach - through error of roadway holing - through 贯通测量邻通误差预计 |
| 3. | Research on long distance sub wire carrying out measure way 长距离支导线贯通测量方法研究 |
| 4. | Inquiring into large cut - hrough survey in west district of datong no . 1 mine 打通一矿西区大型贯通测量探讨 |
| 5. | Function of long and short sides measure method in holing - through survey 长短边测量方法在贯通测量中的作用 |
| 6. | Measurement on long distance transfixion of 21302 face in xiangshan mine 象山矿21302工作面长距离贯通测量实践 |
| 7. | Measures to improve cut - through survey accuracy of long - distance tunnel 提高矿井长距离平硐贯通测量精度的措施 |
| 8. | Cut - through survey of west belt - haulage main roadway at no . 2 level of luling mine 芦岭煤矿二水平西部胶带运输大巷贯通测量 |
| 9. | Preliminary analysis of shaft deepening through survey of auxiliary shaft at renlou coal mine 任楼煤矿副井井筒延深贯通测量浅析 |
| 10. | Practice on expansion area fan shaft great crossing measuring project in nanye coal mine 南冶煤矿扩大区风井大型贯通测量工程的实践 |