| 1. | Object - oriented finite element analysis in construction by the top - down method 逆作法施工的面向对象有限元数值模拟分析 |
| 2. | Application of semi - inverse construction method in a rotation flow sedimentation pool engineering 半逆作法施工技术在旋流沉淀池工程中的应用 |
| 3. | Inverse construction method applied in the construction of guangzhou new international airport light - rail station 广州新国际机场轻轨站工程逆作法施工技术 |
| 4. | Excavation method for deep foundation pit and top - down construction technique of ribbed plate anchored retaining wall 深基坑开挖与板肋式锚杆挡墙逆作法施工技术 |
| 5. | Study on top - down construction technique for deep foundation pit in peripheral shoring position of subway station 与地下铁道围护位置冲突的建筑深基坑逆作法施工技术研究 |
| 6. | Although advantages of reverse order , the development of reverse order for construction is limited by its incompleteness . a lot of studies are finished 此外,逆作法施工的临测及环境监护研究也是逆作法施工技术研究的重要内容。 |
| 7. | At last , according to the practice projects , the thesis gives a particular introduction for the application of construction process and the application effect of the top down construction 地下室施工中的基坑监测也是逆作法施工中的重要问题,本文对相关的监测方法也进行了研究。 |
| 8. | The author gave a detailed study on means to caculating method of loads , internal stress , and sedimentation with the main structure . appropriate measures had been taken to deal with the joints of construction and structure 本文详细分析研究了地下连续?在逆作法施工时其荷载、内力、沉降等的计算方法,并提出了相应的施工与结构接头的作法。 |
| 9. | The diaphragm wall of top down construction not only supports the horizontal loads at stage of the temporary construction , but also bears vertical loads , as a part of the main structure , the outer wail of the basement 逆作法施工中的地下连续墙不仅在施工时起临时支护作用,承受水平荷载,而且可直接作为地下室的外墙,并承担一定的竖向荷载。 |
| 10. | Based on the present situation of top down construction for underground engineerings , the author illustrated the advantages , disadvantages and technology of top down construction and analyzed some key problems for top down construction 本文结合地下工程中逆作法施工的发展现状,介绍了逆作法施工的优缺点及其施工工艺,并针对逆作法施工中的几项关键环节,进行了详细的分析和研究。 |