| 1. | Angang no . 2 steel - making works advancing with times and creating brilliance 安钢二炼钢与时俱进创辉煌 |
| 2. | Technology reformation of no . 2 small section mill of jinan iron and steel company 济钢二小型厂的技术改造 |
| 3. | Production test of mixed iron minerals of brazil in sintering at pinggang 萍钢二铁烧结配加巴西铁精粉的生产试验 |
| 4. | Talk about process reengineering of performance assess system of enterprise 兼谈马钢二铁总厂绩效考核信息系统项目 |
| 5. | Application of regenerative combustion technology to heating furnace of the second rolling mill at xisteel 蓄热燃烧技术在西钢二轧加热炉上的应用 |
| 6. | The control for parts of noise sources of lime kiln in no . 2 sintering plant , ma anshan iron amp; amp; steel company 马钢二烧石灰窑部分噪音源的治理 |
| 7. | Application of regenerative combustion technology in the walking beam furnace of the second high speed wire plant of tisco 蓄热式燃烧技术在唐钢二高线步进梁式加热炉的应用 |
| 8. | A nueral network model for predicting the silicon content of the hot metal at no . 3 blast furnace in tangshan iron and steel co 唐钢二炼铁厂3号高炉铁水硅含量神经网络预报模型 |
| 9. | One is the strengthening and overhauling of steel ladle in bao steel . the other one is overhauling of no . 2 blast furnace frames also in bao steel 一是宝钢炼钢厂钢包加固修复实例,二是宝钢二号高炉易地大修高炉框架焊接方案。 |
| 10. | Abstract : the conception and automatic control demand for raw materials field modification project of 2 ironmaking plant in tangshan i & amp; s co . were presented in this paper 文摘:介绍了唐钢二铁厂原料场改造设计的主要工艺特点及自动化控制要求。 |