| 1. | Necessary pressure tubes and steel beams may be either incorporated in the block or added later, depending on the design . 按设计要求,必要的压力导管和钢梁可以与成形件做在一起,也可以以后再加。 |
| 2. | Over - all stability reduction coefficient of steel beam 钢梁整体稳定系数58 |
| 3. | Analysis of integral stability of steel beam under restriction 约束条件下钢梁的整体稳定分析 |
| 4. | Methods of test for falsework equipment - floor centres 脚手架设备试验方法.第1部分:可调钢梁 |
| 5. | The impact dynamic response of a simply - supported steel beam in fire 受火侵袭简支钢梁的冲击动力响应 |
| 6. | The bolt cable suspanded steel beam support technology along goaf roadway 沿空留巷锚索吊挂钢梁支护技术 |
| 7. | Control of the technological indexes in the steel crownblock beam manufacture 天车钢梁制做工艺指标控制 |
| 8. | Specification for the design and testing of steel overhead runway beams 架空吊车道钢梁的设计与试验规范 |
| 9. | Analysis on the elastic stability of elastic restraints for h - section steel beams 型截面钢梁的弹性稳定性分析 |
| 10. | Sips side impackt protection system 侧撞防护钢梁 |