Mobile
Log In Sign Up
Home > chinese-english > "间隙时间" in English

English translation for "间隙时间"

chill time

Related Translations:
导线间隙:  conductor spacing
椭圆形间隙:  oval-clearance
间隙计:  clearance meter
间隙扫描:  gap scanning
允许间隙:  allowable clearancepermissible clearance
左肋间隙:  left intercostal spacelics
防爆间隙:  flame-proof gap
间隙阴离子:  interstitial anion
圆周间隙:  circumferential clearanceperipheral clearance
时序间隙:  slot, time
Example Sentences:
1.In this article , according to heat conduction theory and finite element theory , the temperature field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method , and the distribution law of the temperature field in the arch dam during construction and operation are systematically studied , and according to the construction process of concrete arch dam , the effect of lamination placement , construction interval , thermal insulation change , surrounding temperature change and water storage on temperature field in the arch dam are also considered
论文根据热传导理论及有限元理论,用三维有限元浮动网格法对施工期和运行期温度场进行了全过程仿真分析,较为系统的研究了混凝土拱坝施工期和运行期温度场分布规律,在分析中按照混凝土拱坝施工过程,考虑了混凝土分层浇筑、施工间隙时间、绝热温升过程及坝体材料分区、水库分期蓄水和环境温度变化等因素对坝体温度场的影响。
2.In this article , according to heat conduction theory , elastic creep theory and finite element theory , the temperature field and creep stress field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method , and the distribution law of the temperature field and creep stress field in the arch dam during construction and operation are systematically studied , and according to the construction process of concrete arch dam , the effect of lamination placement , construction interval , elastic modulus change , thermal insulation change , surrounding temperature change , concrete creep and autogenous volume change on thermal stress in the arch dam are also considered
论文根据热传导理论、弹性徐变理论及有限元理论,用三维有限元浮动网格法对拱坝施工期和运行期温度场、徐变应力场进行了全过程仿真分析,较为系统的研究了混凝土拱坝施工期和运行期温度场、徐变应力场的分布规律,在分析中按照混凝土拱坝施工过程,考虑了混凝土分层浇筑、施工间隙时间、弹模变化、绝热温升过程、环境温度的变化、混凝土徐变、自生体积变形等因素对坝体温度应力的影响。
Similar Words:
"间隙扫查" English translation, "间隙扫描" English translation, "间隙深度" English translation, "间隙生长" English translation, "间隙生物" English translation, "间隙式高速摄影机" English translation, "间隙式固溶元素极少的材料" English translation, "间隙式化合金" English translation, "间隙式混砂机" English translation, "间隙式迁移" English translation