| 1. | Psi 327 . pick up test mandril and place in bop 吊起试压防喷器芯子并装入防喷器组 |
| 2. | Lift bop stack and replace wellhead connector ax ring 吊起防喷器组并更换连接器 |
| 3. | Pick up test mandril and place in bop 吊起试压防喷器芯子并装入防喷器组 |
| 4. | Run the guide lines into the guide posts on the bop stack 将导向绳装进防喷器组上的导向柱内。 |
| 5. | Hoist the bop stack with the hook and have an overall check 用钻机大钩提起防喷器组并进行全面检查。 |
| 6. | Test the bop stack on the stump 在试验桩上试验防喷器组。 |
| 7. | Place bop stack on the test pump 将防喷器组放在试压桩上 |
| 8. | Use the bop crane to pick up the bop stack onto the beams of the moonpool 用防喷器吊车将防喷器组吊到滑动门上。 |
| 9. | Set the bop stack on the stump and close the hydraulic connector , and then secure it 将防喷器组吊坐到甲板试验桩上、关液压爪形连接器,并固定。 |