| 1. | Then he made his way to the tunnel mouth . 于是他走到隧道入口。 |
| 2. | " general view of the completed underpass entrance 已完成的行车隧道入口概览 |
| 3. | Direction sign showing entrance to subway 行人隧道入口的指示标志 |
| 4. | C construction of a portal building on the east side of nam wan tunnel , a west portal structure on the west side thereof and a west control building ; and C在隧道西面兴建控制大楼和隧道口建筑物及在东面兴建隧道入口大楼;及 |
| 5. | The driver reportedly lost control of his car which mounted onto the exchange bus station near the entrance to shing mun tunnel , knocking down two male passengers waiting for buses 私家车驶至近城门隧道入口时,据报失控而冲上巴士转乘站,撞倒两名正在等候巴士的男乘客。 |
| 6. | Comprises a 7 . 6 km dual 3 - lane highway . the major elements of the project include : - a 1 . 5 km road connecting the western portal of nam wan tunnel with cheung tsing highway west tsing yi viaduct 一条1 . 5公里长的行车道,将南湾隧道西隧道入口连接近青衣西北交处的长青公路青衣西高架道 |
| 7. | A 1 . 1 km road connecting the eastern portal of nam wan tunnel with stonecutters bridge east tsing yi viaduct ; a 1 . 6 km high level bridge , with a centre span of 1 , 018 m , crossing rambler channel stonecutters bridge 一条1 . 1公里长的行车道,将南湾隧道东面隧道入口连接位于青衣岛东南部的昂船洲大桥青衣东高架道 |
| 8. | A 30 - year - old american man who went missing earlier this month was located last ( march 11 ) night . he was located at the entrance of western harbour crossing on connaught road west by the tunnel staff 警方昨晚(三月十一日)接获西区海底隧道职员报案,指在干诺道西西区海底隧道入口发现一名于三月初报失的三十岁美藉男子。 |
| 9. | Construction of a 4 . 5m diameter , 4 . 5km long cable tunnel with a portal at lung fai street near castle peak power station and a ventilation building near sun tuen mun centre in tuen mun ( see figure 2 ) 修建一直径4 . 5米,长4 . 5千米之电缆隧道,及一位于龙辉街近青山发电厂之隧道入口,以及一位于屯门近新屯门中心的通风机房(见图2 ) 。 |