Mobile
Log In Sign Up
Home > chinese-english > "静力触探试验" in English

English translation for "静力触探试验"

cone penetration test(cpt)
static cone penetration (spt)
static cone penetration test


Related Translations:
探试:  probetest
探试搜索:  heuristic search
探试映射:  heuristic mapping
探试能力:  essay
探试程序:  heuristic programheuristic routine
中止探试:  killer heuristic
探试函数:  heuristic function
探试法:  heuristic methodheuristics
推理探试:  inferential heuristics
归纳探试:  induction heuristic
Example Sentences:
1.Specification for cone penetration test
静力触探试验规程
2.Static cone penetration test
原位测试静力触探试验
3.Application of static cone penetration test in geotechnical engineering investigation
静力触探试验在岩土工程勘察中的应用
4.The shear strength increases by 3 - 6 times after improvement through vane shear test and the resistance increases largely through cpt . the soft foundation treated by vacuum combined with surcharge preloading is very effective . second , the mechanism and some problems of vacuum combined with surcharge preloading were analyzed
通过十字板剪切试验与静力触探试验,加固后土体的抗剪强度一般可提高3 6倍,锥尖阻力与侧壁阻力也有大幅增长,说明真空联合堆载预压加固软土地基的效果显著。
5.By comparing a number of dmt data with parameters of lab tests , cone penetration tests and vane shear tests from several magnitude projects in shanghai , the authors develop empirical formulae for calculating the bearing capacity of foundation soil from the dmt and assess their accuracy
利用上海地区部分重大工程中的扁铲侧胀试验数据,在与室内土工试验、静力触探试验及十字板剪切试验的试验参数相关分析的基础上,经数理统计后给出了上海地区用扁铲侧胀试验计算地基承载力的经验公式,并对其计算精度进行了评价。
6.Adopting the deformation harmony theory , the numeric calculation of the curve of load versus settlement is made . the fitting results between the calculated curve of load - settlement and the measured one of piles with different construction process are illustrated . hence , under the condition of few or no static load test data , the performance of bearing capacity of single bored pile in loess may be predicted utilizing indexes of shear wave velocity , static cone penetration test and modification coefficient of depth , so it is remarkable to reduce the blindness of preliminary design of pile
通过室内试验及原位测试指标进行理论计算与现场实测值的对比,笔者引入了施工工艺修正系数k _ ( c1 )和k _ ( c2 )及深度修正系数,使理论计算值与现场实测值具有良好的一致性,进而通过变形协调理论对荷载?沉降曲线进行数值计算,并用不同施工工艺的实例说明了理论计算荷载?沉降曲线与实测荷载?沉降曲线的拟合效果,从而达到可在不做静载荷试验或少做静载荷试验的情况下通过剪切波速和静力触探试验指标以及施工工艺修正系数等预测黄土地基中钻孔灌注桩承载性状,这对于工程初步设计中减少设计的盲目性具有十分重要的现实意义。
Similar Words:
"静力测试" English translation, "静力场" English translation, "静力郴稳定场" English translation, "静力触探" English translation, "静力触探车" English translation, "静力触探探头阻力" English translation, "静力触探仪" English translation, "静力弹簧重力仪" English translation, "静力弹性模量" English translation, "静力的" English translation