| 1. | Microcomputer management of checking survey 采剥测量验收的微机管理 |
| 2. | Practice for acceptance of evidence based on the results of probability sampling 根据概率取样结果进行数据验收的惯例 |
| 3. | Standard practice for acceptance of evidence based on the results of probability sampling 根据概率取样结果所得数据验收的标准实施规范 |
| 4. | Combined accept - zero sampling systems and process control procedures for product acceptance 产品验收的组合接受零点抽样系统和过程控制规程 |
| 5. | Motion picture and television production studio soundstages and approved protection facilities 移动图片和电视制作工作室发声场所和已验收的防护设备 |
| 6. | Test method for installation acceptance of plastic gravity sewer lines using low pressure air 使用低压空气对塑料自流排水管道进行安装验收的试验方法 |
| 7. | Organize preparations of proposals in terms of project regarding technical changes 组织公司技改工程的方案编制,现场施工管理组织,以及工程验收的相关工作。 |
| 8. | 27 do all lots have lot acceptance dates identified by the year , month , and date the lot was accepted 所有批次是否都有批次接收日期,表明批次验收的年、月、日? |
| 9. | Has all inspection , measuring , and test equipment used forproduction acceptance been uniquely identified 用于产品验收的所有检查、测量和测试设备都做特别的标示了吗? |
| 10. | Potatoes - good practices for delivery acceptance of ware potatoes intended for the fresh produce market 马铃薯.准备供应新鲜农产品市场的食用马铃薯交货验收的正确运作方法 |