English translation for "高桩承台"
|
- elevated pile foundation
high-level deck high-rise pile cap
Related Translations:
桩: Ⅰ名词(桩子) pile; pole; stake 短语和例子打桩 drive piles; set up row of stakes; 拴牛桩 a pole for tying up cattleⅡ量词(用于事情) 短语和例子一桩小事 a trifle; 一桩要案 an important case; 一桩生意 a business 承: Ⅰ动词1.(托着; 接着) bear; hold; carry 短语和例子薄冰承不住卡车重量。 the thin ice cannot bear truckloads. 那木桥承得住这样重的卡车吗? can that wooden bridge carry such heavy trucks?2.(承担) undertake; contract (to do a job) 桩承基础: pile supported foundation 桩承基脚: pile supported footing 端承桩: end bearing pileend-bearing pilepoint bearing pile 桩承台: pile capplatform on pilesrelieving-type platform supported on piles
- Example Sentences:
| 1. | High - rise pile cap 深基础高桩承台 | | 2. | The stability of elevated pile caps is an issue deserving concern either in the design procedures or at construction stages 摘要高桩承台的稳定,在设计与施工过程中是值得关注的。 | | 3. | With the development of construction technology and mechanic about deepwater foundation , hanging box weir had being applied widely for construction of high pile cap 随着深水基础施工技术和机械的发展,吊箱围堰在高桩承台施工中的应用日益广泛。 | | 4. | With reference to the practical design of a bridge , the stability and ultimate carrying capacity of the elevated pile caps of the bridge are computed by numerical method known as elasto - plastic finite element analysis 结合某桥设计实践,按弹塑性有限元方法,对高桩承台的稳定性进行了分析,解算了结构的极限承载力。 | | 5. | The construction technique in question is applicable to the river reach where water current directions and water levels are varying and to the construction of bored piles and elevated pile caps for deep water foundations of major bridges over river and sea in the offshore area 本项新技术可运用于水流方向多变、水位变化大的河段及近海跨江跨海特大型桥梁深水基础钻孔桩及高桩承台施工。 | | 6. | In this thesis , on the basis of the existing construction and design data in the world , as an example of daliao river bridge , which is the second deepwarter bridge above daliao river , the auther makes a review and summary of hanging box construction method , introduces design and construction process of the hanging box of daliao river bridge in detail 本论文以辽河上的第二座深水特大桥? ?大辽河特大桥为背景,在搜集国内外已有的深水基础施工及设计资料的基础上,对吊箱法施工高桩承台工法进行了归纳和总结;对大辽河特大桥高桩承台吊箱的施工设计与施工过程作了较为详细的介绍。 | | 7. | In this paper , by way of example of the elevated pile cap construction of sanmenjiang bridge in liuzhou city , the design and construction of the column steel boxed cofferdam of tensile and compressive type are introduced with particular details given to its design scheme , working principles , construction technology and construction key points , and the matters of attention in the construction with the cofferdam are expatiated as well 以柳州市三门江大桥高桩承台施工为例,介绍拉压柱式钢吊箱围堰的设计与施工,重点介绍钢吊箱围堰的设计方案、工作原理、施工工艺及施工要点等技术细节,同时对钢吊箱围堰施工中的注意事项进行了阐述。 | | 8. | The paper introduces large - scale fem software , algor , by which the auther can build model of hanging box of high pile cap , and simulates accurately three loadcases , which include loadcase behind enclosed concrete , loadcase behind empty water in hanging box , and loadcase behind high pile cap construction . the auther calculates tensor and displacement of hanging box weir when loads exert panels , supports , suspenders , top beams , base beams of hanging box weir . at the same time the auther carrys out th e stability analysis , besides , educes calculational and analytical data , which are tally with construction result in the main 论文介绍大型通用有限元计算软件algor ,并用软件建立大辽河特大桥高桩承台吊箱围堰的全结构模型,相对准确地模拟灌注封底混凝土后、抽除吊箱内河水后、承台破冰体施工后等三种受力工况,并用模型进行了应力和变形的计算,计算各工况荷载作用于吊箱全结构箱体板面、内支撑、吊杆、悬吊顶梁、底梁等的应力和变形,并对比吊箱围堰板面计算变形和施工实测变形,结果是吻合的;对大辽河特大桥高桩承台轻型吊箱的稳定性进行了计算分析;论文研究工作表明,应用组合有限元方法计算大型施工结构问题具有现实意义。 |
- Similar Words:
- "高转速胶合机" English translation, "高转速螺旋" English translation, "高转速木材拼板机" English translation, "高转速四头输出" English translation, "高转移乳腺癌" English translation, "高桩拉线" English translation, "高桩码头" English translation, "高桩码头设计与施工规范" English translation, "高桩台码头" English translation, "高椎虫属" English translation
|
|
|