| 1. | Welding of the split runner of turbine in ertan hydro station 二滩水电站水轮机分瓣转轮的焊接 |
| 2. | The realization of virtual environment for ertan hydroelectric station 二滩水电站虚拟环境的实现 |
| 3. | Automation component of turbine at ertan hydripower station 二滩电站水轮机自动化元件的安装与调试 |
| 4. | Welding and assembly of generator rotors for ertan power station 二滩水电站发电机转子的焊接和组装 |
| 5. | Strong earthquake station of arch dam for ertan hydro - electric power factory 二滩水电站拱坝强震台阵介绍 |
| 6. | The fertues of hydro - generator stator installation of ertan power station 二滩电站水轮发电机定子安装特点 |
| 7. | Study on the optimization of the forward electric quantity of ertan hydropower station 二滩水电站期货电量优化研究 |
| 8. | New technology of the magnetic yoke lamination of the rotor in ertan hydro power station 二滩水电站转子磁轭叠片新工艺 |
| 9. | Treatment on welding crack on connecting plate of turbine at ertan hydropower project 二滩水电站水轮机连接板焊接裂纹处理 |
| 10. | Ertan hydropower station is the first power station built on yalong river 摘要二滩水电站是雅砻江梯级开发的第一个水电站。 |