| 1. | Design standards of hydropower headrace and forebay 水电站引水渠道及前池设计规范 |
| 2. | Design specifications for hydropower headrace and forebay 水电站引水渠道及前池设计规范 |
| 3. | Numerical simulation of sill flows in the forebay of pumping station 泵站前池底坝整流数值模拟研究 |
| 4. | Strengthening measures for forebay of xinhekou pumping station and their effect 新河口泵站前池加固措施及其效果 |
| 5. | Numerical simulation of flow patten in the front inflow forebay of pumping station 泵站正向进水前池流态的数值模拟 |
| 6. | Computation and analysis of 3 - d curved - flow of pumping station forebay and improving of the flow pattern 泵站进水弯道三维流动分析及流态改善研究 |
| 7. | The results show that the water - level controlling system has wide stable domain and stable condition is easy satisfied and the domain is larger when the forebay time constant tq is bigger 分析表明,水位调节模式下调节系统的稳定条件容易满足,稳定域很大,前池时间常数t _ q大的更有利于调节系统稳定。 |
| 8. | In this paper , in order to solve the economic production of run - of - river hydropower plant , the new control mode of regulating the water - level of the forebay is introduced into the hydraulic turbine governor 本文针对带有前池的引水式电站经济运行的需要,在水轮机调节器运行方式中引入前池水位调节这一新型控制方式。 |
| 9. | Meanwhile , because there are a lot of sediments in sewage in the forebay , the bad flow pattern will make sediments depositing freely and the sediment deposition will cause worse flow pattern 同时,由于排污泵站进水水流中含有大量的悬浮固体颗粒,不良的前池流态会使泥沙更容易在前池淤积,而泥沙淤积又进一步加剧了前池流态的恶化。 |
| 10. | The primary results showed that the hybrid grid method and corresponding mathematical model are especially suitable for simulating complicated flows in forebay of pumping station , in which bottom sill , diversion wall and underwater piers were installed 可以较好地模拟出局部区域复杂的水流流态,生成网络的计算工作量小,能非常方便地进行不同整流方案的计算比较,实用性强。 |