This port - lrt line will use the existing right - of - way of the kpr and some small sections of road 路口采优先通过之号志控制方式之轻轨运输系统。
2.
The kaohsiung mass rapid transit system made up of red and orange lines is now at a detailed planning and design stage using the bot method . it is planned to commence revenue services in six years . the kaohsiung port - rail kpr line is located at an inner orbital position on the kmrt network which will cross it in longitudinal and latitudinal directions 建议采用标准轨距,架空线供电之大部分低底板六轴联结式轻轨车辆,通车初期每列车以一至二辆编组营运,远期则采二至三辆编组,月台设计长度为90公尺,以付费证明系统收费,平面段采b