| 1. | Thorough cleaning before move - in after move - out 入伙或吉屋清洁 |
| 2. | Study on computer simulation of moving process of bionic move - in - mud robot 仿生拱泥机器人运动过程计算机仿真研究 |
| 3. | The move - in process is expected to last for about 10 hours till 8 pm 警方预计整个过程需时约十小时直至晚上八时。 |
| 4. | The simulation of this method shows that it can reduce the depth error of the move - in - mud robot 仿真结果表明该方法能减小拱泥机器人的深度误差。 |
| 5. | Nov . 10 sat . to nov . 12 mon . : move - in , booth display and decoration 9 : 00 am to 5 : 00 pm 11月10日星期六11月12日星期一:搬入展间布置装饰9点17点 |
| 6. | Valid residence permit holders who move into shenzhen shall register the move - in within 10 days 持有效居留许可由深圳外迁入的,须于10日内办理迁入登记。 |
| 7. | Entrance permits are to be collected from the exhibitors registration counter on - site during move - in period 参展商可在布展期间于参展商登记处领取入场通行证。 |
| 8. | Description : hdb approved . high - floor 3 + 1 rooms , fully furnished with aircon in all rooms , can move - in 政府批准全间出租,环境好,高楼层,全家具、电器、冷气,随时可迁入。 |
| 9. | Exhibitors shall move - in to the exhibition venue according to the arrangements and within the time limits specified by the organizer 参展商必须根据组织者的安排,在组织者规定的时限内进入展会地点。 |
| 10. | Cension commenced its construction in october 2005 , the equipment moved - in on december 18th 2006 and mass production started in april 2007 项目于2005年10月开始动工建设, 2006年12月18日开始设备迁入, 2007年4月开始试生产。 |