| 1. | Construction of a single two - lane road of about 250 m between castle peak road and san sham road 在青山公路与新深路之间兴建长约250米的双线不分隔道路 |
| 2. | Construction of a single two - lane road of 50 m in length connecting kwu tung road to the road mentioned in paragraph above 兴建长50米的双线不分隔道路,把古洞路与上文a段所述的道路连接起来 |
| 3. | Long single two - lane road between pak kung au and cheung sha , including elevated highway structures of a total length of 750 m , with a footpath of a minimum width of 1 . 6 m 长的双线不分隔道路,沿路辟设最少1 . 6米阔的行人路当中包括总长750米的高架公路结构 |
| 4. | Construction of a single two - lane road of 850 m in length for the eastbound traffic from san tin highway to the vha in lok ma chau including 450 m of elevated highway structures 在新田公路至落马洲车辆轮候区之间兴建一条长850米的双线不分隔道路,供东行车辆使用,其中包括兴建450米的高架道路构筑物 |
| 5. | Construction of a single two - lane road of 1 . 5 - kilometre in length for the westbound traffic from fanling highway to the vehicle holding area in lok ma chau including 800 m of elevated highway structures 在粉岭公路至落马洲车辆轮候区之间兴建一条长1 . 5公里的双线不分隔道路,供西行车辆使用,其中包括兴建800米的高架道路构筑物 |
| 6. | Section of tung chung road between lung tseng tau and pak kung au from a single - lane road for two - way traffic to a single two - lane road for two - way traffic with a footpath having a minimum width of 1 . 6 m ; construction of a 长的东涌道进行扩阔工程,由单线双程道路改为双线不分隔道路,沿路辟设最少1 . 6米阔的行人路,并为这段道路重新定线 |
| 7. | Widening and realignment of a 3 . 6 km section of tung chung road between lung tseng tau and pak kung au from a single - lane road for two - way traffic to a single two - lane road for two - way traffic with a footpath having a minimum width of 1 . 6 m , and construction of a 2 . 6 km long single two - lane road between pak kung au and cheung sha , including elevated highway structures of a total length of 750 m , with a footpath of a minimum width of 1 . 6 m ; provision of 21 passing bays bus - bays along the road and a roundabout at cheung sha ; and 在井头至伯公坳一段长3 . 6公里的东涌道进行扩阔工程,把这段单线双程道路改为双线不分隔道路,以供双程行车,并为这段路重新定线,另沿路设置最少阔1 . 6米的行人路,和在伯公坳与长沙之间筑建一条长2 . 6公里的双线不分隔道路,包括总长度为750米的高架道路构筑物,另沿路设置最少阔1 . 6米的行人路 |