Mobile
Log In Sign Up
Home > english-chinese > "专家评定" in Chinese

Chinese translation for "专家评定"

expert's statement

Related Translations:
评定人:  adjuster
疟疾专家:  malarialist
造船专家:  shipbuilder
专家结论:  expert conclusion
本国专家:  national expert
专家在线:  profnetspecialists online
后勤专家:  logistician
应用专家:  application experts
信息专家:  information specialist
专家参数:  expert parameter
Example Sentences:
1.It concludes that the result of fuzzy recognition and cluster is the same as the result of expert estimate through analyses of an example
并通过实例分析进行验证,模糊识别聚类结果与专家评定结果是相吻合的。
2.Taking advantage of analytic hierarchy process and the result of bedding assessed by expert on all indexes , we can calculate the proportion . as long as we select the concrete content of all indexes at the time of repairing , we can assess whether repair is difficult or easy
利用层次分析模型,对各项指标经过专家评定,计算权重,只要选定维修时各指标中的具体内容,就可以评估该方案的维修难易程度。
3.The purpose of the research is developing the adolescent coping with stress scale ( acss ) fit for chinese adolescents based on adolescent coping theory , opened question , previous researches , pretest , expert assessing et al . the dimensions and structure of the acss were examined through exploratory factor analysis ( efa ) & confirmatory factor analysis ( cfa )
因此,本研究拟在青少年应对理论与开放式问题的基础上,结合前人研究、预试和专家评定等多种方式,编制一个适合中国青少年的压力应对测评量表,通过探索性因素分析和验证性因素分析,探讨青少年压力应对的维度与结构,弥补国内这一领域的不足。
4.Seven chapters are included in this thesis . the first chapter is the introduction about the necessity of bridge detection and common defect of the bridge . the second chapter introduces the structural basic condition and defect details of the bridge . the third chapter describes the preparation for the detection work . including the overall investigation of the diseases and the condition at operation , the set - up of loading test and control measures and structural computation . the 4th chapter is on - the - site detection , which consists of static and dynamic tests and necessary data collecting for analysis and evaluation . the 5th chapter is the analysis of detention data . according to collected data of loading tests , the results of static and dynamic tests are analyzed . the 6th chapter evaluates the strengths , rigidity . stability and dynamic characteristics of the bridge , so that the conclusion can be reached . the 7th chapter is summarization
第六章是检测评定结论,全面评定该桥的强度、刚度、稳定性和动力特性,从而给出检测评定结论。第七章是总结,在对本项目的工作内容和工作特点进行总结的基础上,指出了旧桥检测存在的问题以及今后发展的方向。同时,通过对本次检测工作的研究,初步形成了一套特大跨径旧钢桥的检测评定方法,即:全面的病害和运营状况调查、现实状况计算分析、制定加载试验方案和加载控制措施、加载试验、综合桥梁分析专家评定
5.Then , the concept of entropy was employed to get the objective weight of every index . finally , combining the subjective weight which made by the experts with the objective weight of every index , each biding project was synthetically evaluated . thus the rank - ordering and optimization of projects can be achieved
然后,引入熵信息的概念,确定各指标的客观权重,再结合专家评定的各指标的主观权重,对诸投标方案进行综合评定,最终实现投标方案的排序和优选。
Similar Words:
"专家模式开关" Chinese translation, "专家内行" Chinese translation, "专家牌手" Chinese translation, "专家判断" Chinese translation, "专家判断模型" Chinese translation, "专家评估" Chinese translation, "专家评价" Chinese translation, "专家评价员" Chinese translation, "专家评论" Chinese translation, "专家评判" Chinese translation