| 1. | The droids have started up their main power generators 机器人部队已经启动了主发电机 |
| 2. | Yes , lord vader . i ' ve reached the main power generators 是的,维达勋爵我已经到达主发电机 |
| 3. | Parallel - running test for main generator 主发电机并联运行试验。 |
| 4. | Load and performance test for main generator ( emergency generator ) 主发电机(应急发电机)负荷及特性试验。 |
| 5. | Automatic governing test of voltage and frequency for main generator ( emergency generator ) 主发电机(应急发电机)电压、频率自动调节试验。 |
| 6. | Design method of the main part of the hybrid excitation rare earth permanent magnet synchronous generator 组合励磁永磁同步发电机主发电机的设计方法 |
| 7. | This paper also gives the analysis and researches the possible operating scheme in main generator and subsidiary generator 并对副发电机与主发电机可能运行方案做了深入的分析研究。 |
| 8. | The main power generator groups in platform power stations are basically piston natural gas generator group and gas turbine generator group 摘要近海油田平台电站主发电机组主要是活塞式燃气发电机组和燃气轮机发电机组。 |
| 9. | It not only has electromagnetism but also has mechanism conduction as the main generator and accessory generator operating in the same power system 当副发电机与主发电机运行于同一电网时,二者不仅有电磁联系,而且有机械联系。 |
| 10. | The subsidiary generator output depends on the load of power system when the main generator and subsidiary generator operating in separate power system 当副发电机与主发电机分别运行于两个独立电网时,由于机组转速取决于主发电机所在的大电网,副发电机将承担其所在电网的全部变动负荷。 |