Mobile
Log In Sign Up
Home > english-chinese > "人员分配" in Chinese

Chinese translation for "人员分配"

personnel assignment

Related Translations:
人员:  personnel; staff 短语和例子人员不足 understaffed; undermanned; 技术人员 technical personnel; 教学人员 the teaching staff; the faculty; 机关工作人员 office workers; 值勤人员 (of armyman, policeman, etc.) personnel on
分配:  1.distribution; allocation; assignment 短语和例子不公平的分配 an unfair distribution; 地理分配 geographical distribution; 分配上的平均主义 equalitarianism in income distribution; 利润分配 distribution of the profits
Example Sentences:
1.Of residential area , more than 40 staffs of each discipline with rich experiences . some of them are professor level senior engineers , some of them are engineers
人员分配合理,设计团队优秀,既有多年经验的教授级高工,又有年富力强的中青年工程师。
2.At the same time these computers record which hours are busiest and which employees are the most efficient , allowing personnel and staffing assignments to be made accordingly
同时这些计算机记录哪些时间段是高峰,哪些员工最有效率,进而就能对人员分配进行相应的调整。
3.The overall specialist level structure and the age structure from lower to higher is towershaped , absorbing new life strength every year from colleges and universities and adopting the old helping the new combination in the allotment of personnel and organization , focusing on the young talent train , fully giving special treatment
人员分配和组织上采取老带轻的组合,着眼于对年轻人才的培养,充分给予特殊待遇,公司制订了技术人员技术股份奖励的办法规定,为其创造有利的生活条件和良好的工作环境。
4.( 2 ) . wbs is an important basis in project management and a necessary clue of activity chain . taking the aim and function of the srttep plan as a starting point in consideration , with the introduction of the prearranging ideas such as concept design , detailed design and rolling design , the thesis puts forward project working structure resolving method based on wbs three - class model , thus realizing the working structure resolution by using gradually - deepened gradation model and laying foundation on better plan , staff disposition and budget plan
( 2 )项目工作结构分解( wbs )是项目管理的重要依据和活动链接的必要线索,本文从川塔施建工程项目工作计划的目的和作用出发,引入概念设计、详细设计、滚动设计的事前规划思想,提出了基于wbs三级模型的项目工作结构划分方法,利用逐级深入的层次模型实现项目的工作结构分解,为项目进一步的进度计划、人员分配、预算计划奠定了坚实的基础。
Similar Words:
"人员防护" Chinese translation, "人员防护措施" Chinese translation, "人员访问" Chinese translation, "人员费" Chinese translation, "人员费用" Chinese translation, "人员分配问题" Chinese translation, "人员分析" Chinese translation, "人员服务" Chinese translation, "人员负荷图" Chinese translation, "人员岗位培训" Chinese translation