| 1. | Connect the choke and kill lines to slip joint 将放喷和压井胶管与伸缩节连通。 |
| 2. | Lay down the slip joint to the main deck 将伸缩节吊到主甲板上。 |
| 3. | Remove the high pressure choke and kill hoses from the slip joint 从伸缩节上卸开高压放喷和压软管。 |
| 4. | Attach the riser tensioners , choke and kill lines to the slip 将隔水管张力器,压井及放喷管线连到伸缩节上。 |
| 5. | Stainless steel telescopic joint 不锈钢伸缩节 |
| 6. | Pick up the slip joint 上提伸缩节。 |
| 7. | Pick up the slip joint 起伸缩节 |
| 8. | Points out problems in setting expansion joints for supply and return water risers 摘要指出了在供回水立管中间设置伸缩节存在的问题。 |
| 9. | Lock the support ring onto the diverter housing and release it from the slip joint 将隔水管张力器支撑环销到转喷器壳体上,从伸缩节上松脱。 |
| 10. | Study on the replacing expansion joint in water diversion system in zipingpu water conservancy project 紫坪铺水利枢纽引水系统取消厂前伸缩节研究 |