Mobile
Log In Sign Up
Home > english-chinese > "副坝" in Chinese

Chinese translation for "副坝"

auxiliary dam
counter dam
minor dam
saddle dam
secondary dam
sub-dam
subsidiary dam


Related Translations:
道格拉斯坝:  douglas dam
水田坝:  shuitianba
崩坍坝:  avalanche dam
灰坝:  ash dam
坝肩:  rock dam abutment
尼龙坝:  fabridamnylon dam
鼓坝:  dmm weir dam
中坝:  zhongba
党坝:  dangba
护坝:  check dam
Example Sentences:
1.West col dam of high island reservoir - remedial works
万宜水库西面副坝修葺工程
2.Analysis of phreatic line monitoring data in auxiliary dam of biliuhe reservoir
碧流河水库一副坝浸润线监测资料分析
3.Core wall construction management for the auxiliary dam of the fengcheng upper reservoir
风城高库北副坝心墙施工控制
4.Analysis and application of result from test on weak expansive soil for construction of linhuaigang auxiliary dam
临淮岗副坝弱膨胀土填料试验成果分析及应用
5.Additionally , the government constructed 3 subsidiary dams , situated at rocky harbour and the sai kung peninsula . the purpose of this was to close up shallow valleys in order to prevent water overflowing through this naturally depressed terrain
除东、西主坝外,另于粮船湾洲、西贡半岛建有三条规模较小的副坝,功用在封闭相邻的山谷,并防止水库满溢。
6.When completed the concrete dam was 150 ft . high and was the most magnificent of its kind in hong kong . aside from the main dam , there were three subsidiary dams , 37 kms of catchwaters , a water treatment works in tsuen wan and service reservoirs in lai chi kok , ma tau wei , diamond hill and ngau tau kok
除主坝外,还包括了三条副坝、长37公里的引水道、配合水塘供水的荃湾滤水厂,以及荔枝角、马头围、钻石山、牛头角等配水库,集水区广达2 , 000亩。
7.The result shows that the profile of the main dam and the second dam and all the impervious rock fill material have no problem . the total seepage volume is 3 . 9092x106m3 per year . it occupies 0 . 037 % of the average inflow of the reservoir , which is acceptable from the point of view of the water resources utilization
分析结果:确定采用的主、副坝坝剖面及各种筑坝料在渗透稳定性方面均无问题;全坝渗漏总量为390 . 92万m ~ 3年,占多年平均入库水量的0 . 037 ,从水资源利用的角度是可以接受的。
8.Through the analysis of the status of huangbizhuang reservoir and other problems , such as its destruction caused by water seeping , and with the reference to the internal successful application , the project adopted the measure of constructing concrete cut - off wall on body and foundation of the auxiliary dam between stake no . 0 + 840 and stake no . 5 + 740
通过分析黄壁庄水库现状及存在的渗透破坏等问题,类比国内成功的工程实例,本工程副坝在桩号0 + 840至5 + 700采用在坝体和坝基建混凝土防渗墙处理措施。
9.The technique of splitting grouting is a method for handling the earth dam " s stability with deformation and permeation . it is developed quickly in several decades . the author , regarding left subsidiary dam of shenzhen reservoir as an example , uses the limited element method to proceed the dam ' s seepage calculation , combines the contrast analysis with prototype data and predicted data , then compares the dam ' s seepage behavior " s changes before splitting grouting with that after splitting grouting , has some basic conclusions
土坝坝体劈裂灌浆技术是近几十年来发展迅速的一种处理土坝坝体变形稳定和渗透稳定问题的方法,本文以深圳水库左副坝为具体实例,利用有限单元法进行了坝体渗流计算,并与原型观测资料进行对比分析,然后比较了劈裂灌浆前后坝体渗流状况的改变,并对坝坡稳定进行分析,得出了一些基本结论,对利用有限单元法求解劈裂灌浆前后坝体的渗流问题提出了一些建议。
Similar Words:
"副]顺时针方向地" Chinese translation, "副阿拉伯胶素" Chinese translation, "副矮菊石属" Chinese translation, "副奥长石" Chinese translation, "副把" Chinese translation, "副霸" Chinese translation, "副白苯胺" Chinese translation, "副白蛋白" Chinese translation, "副白蛋白血" Chinese translation, "副白蛋白血症,双白蛋白血症" Chinese translation