Chinese translation for "南北线"
|
- meridian line
namboku line north-south line
Related Translations:
南北露脊鲸: eubalaena australis/eubalaena glacialis 南北炒货: dried vegetable & fruit 南北圆桌会议: north south round table conferencenorth-south round-table conferencenorth_south round_table conference 纵贯南北: stretch from the north to the south 贯通南北: running due north and due south 南北差距: gabetween the north and the southgap between north and southnorth-south gap 贯穿南北: running north and south 南北和: the greatest clvil war on earth
- Example Sentences:
| 1. | 7 - minute walk from nishigahara sta . on the tokyo metro namboku line 东京地铁南北线西原站出口步行7分钟 | | 2. | 5 - minute walk from korakuen sta . on the tokyo metro marunouchi namboku lines 东京地铁丸内线?南北线后乐园站出口步行5分钟 | | 3. | On the toei subway oedo line . 2 - minute walk from no . 1 - 2 exit of korakuen sta 地铁丸内线?南北线后乐园站1 、 2号出口步行2分钟 | | 4. | 1 - minute walk from korakuen sta . on the tokyo metro marunouchi line namboku line 交通:东京地铁丸内线?南北线后乐园站步行1分钟 | | 5. | 7 - minute walk from komagome sta . on the jr yamanote line and the tokyo metro namboku line Jr山手线?东京地铁南北线驹入站出口步行7分钟 | | 6. | 5 - minute walk from no . 1 exit of shirokanedai sta . on the toei subway mita line or the tokyo metro namboku line 都营三田线?东京地铁南北线白金台站1号出口步行5分钟 | | 7. | The concrete continuous beam in the elevated bridge of the south - north line of nanjing subway is firstly tasted in china 摘要南京地铁南北线一期工程高架区段首次在国内采用了预应力混凝土连续梁的型式。 | | 8. | 15 - minute walk from iidabashi or ichigaya sta . on the jr line , the tokyo metro yurakucho line and the tokyo metro namboku line Jr各线?东京地铁有乐町线?东京地铁南北线饭田桥站或市谷站出口步行15分钟 | | 9. | With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake , as well as for excavated field , in line with railway engineering anti - earthquake design specification , dynamic triaxial tests and theoretical analysis using efficient stress method , the author comes to the conclusion that , when metro plate is located at layer s and the layer is thick , liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate , or arch sides at the top of metro in most places 摘要采用铁路工程抗震设计规范、动三轴试验及有效应力的理论分析相结合的方法,对南京地铁南北线( 1号线)区间隧道开挖后其地基土在7度地震情况下的土层液化情况进行分析得出:当隧道底板坐落在5层且5层较厚时的液化区出现在隧道衬砌底板处;局部地段液化区出现在隧道顶部及拱腰;大部分地段的液化区出现在隧道顶板上方。 | | 10. | The length of the green line will be 8 . 95 kilometers in total , with a 0 . 52 - kilometer elevated viaduct section . on the green line , there will be 10 at - grade stations . the line will start from hsinchu chemical station on road no . 5 connecting with the red line at this point , then pass through the downtown area along road no . 5 , circle the downtown area along chingkao road and chunghu road , and finally arrive at hsinchu tr station , where it will re - join the red line 目前研提二个较可行路线,其中南北线全长约8 . 15公里,地下段1 . 8公里,平面段6 . 35公里,设八座车站,含1座地下车站,南端衔接高运量捷运新庄线大桥国小站;东西线全长约5 . 35公里,高架段1 . 5公里,平面段3 . 85公里,设八座平面车站,东端衔接高运量捷运淡水线芝山站。 |
- Similar Words:
- "南北水产公司" Chinese translation, "南北谈判" Chinese translation, "南北铁观音" Chinese translation, "南北文化与发展网" Chinese translation, "南北喜相逢" Chinese translation, "南北向的" Chinese translation, "南北向方格坐标线" Chinese translation, "南北效应" Chinese translation, "南北协调委员会" Chinese translation, "南北协调委员会两主席会议" Chinese translation
|
|
|