Chinese translation for "原电路"
|
- original circuit
primary circuit
- Example Sentences:
| 1. | Cables for aeronautical ground lighting primary circuits 地面航行照明原电路用电缆 | | 2. | Meliorating original circuit system and further improving plc procedures 改进原电路系统,进一步完善plc程序。 | | 3. | And , the basic theory of the pre - amplifier is detailedly analyzed , the important parameters of the pre - amplifier are computed , improvement projects of the pre - amplifier are listed , what ’ s more , in order to resolve disadvantage of original circuit , a new pre - amplifier is designed 再次,详细分析了前置放大电路的工作原理,计算了前置放大电路的各种参数,提出了电路改进的几个方案,针对原电路的缺点,重新设计了一种新的前置放大电路。 | | 4. | In this paper , basic circuit models of cc - current mirror and active impedance are analysed and a new active feedback current mirror is proposed which can achieve larger output impedance , higher current transfer precision , lower power and wider signal dynamic swing 系统地分析了电流传送器的组成模块? ?电流镜和有源电阻,同时提出了一种改进型有源反馈电流镜电路。该电路能大大提高输出电阻,同时能保持原电路的电流转换高精度、低功耗、更宽更良好的输出电压动态范围。 | | 5. | To the defect of the system hard to equilibrate , a new circuit frame to make equilibrium was presented ( 3 ) based on the analysis of interferences of the circuit , some relative means were taken to restrain the interferences . furthermore in order to detect surface conveniently and to improve the testing accuracy some designs of the probe were introducer 针对原电路难以调零的缺点,提出了新的电子平衡电路方案,设计了新的电子平衡电路,新的平衡电路调零精度高,速度快,平衡状态可以长时间保持,缺点是难以利用现有电路,成本较高。 | | 6. | Since high performance control logics are usually hard for non - scan test generation , dft structures could be embedded as offsets in tradition , while it will cause manufacturing cost increase and performance overhead . in this paper , an indirect test generation method based on retiming is proposed , which could dramatically reduce the cost of non - scan atpg without any loss of original optimized attributes . experiments on some iscas 89 benchmarks show the benefits of our approach in enhancing atpg of performance - driven logic 对性能驱动控制逻辑进行测试生成难度较大,通常要加入可测性结构,但会影响原电路优化性能并增加生产成本.本文以重定时理论为基础,提出了对高性能时序电路进行间接测试生成的方法,这种方法在不影响原电路任何优化特性的前提下,可显著降低测试生成时间,提高测试生成质量.在iscas ’ 89部分基准电路进行实验,结果证明了其有效性 |
- Similar Words:
- "原电池组" Chinese translation, "原电流" Chinese translation, "原电流,一次电流" Chinese translation, "原电流调制" Chinese translation, "原电流分布" Chinese translation, "原电路 一次电路 一次回路 初级电路" Chinese translation, "原电路电阻调速器" Chinese translation, "原电路电阻起动器" Chinese translation, "原电压" Chinese translation, "原电子" Chinese translation
|
|
|