| 1. | Highway technical standard research on the feasibility of the project 浅析工程可行性研究阶段公路技术标准的确定 |
| 2. | A brief talk on preparation of soil and water conservation plans for new projects at feasibility study stage 浅谈新建项目可行性研究阶段水保方案的编制 |
| 3. | It defines in detail the activities to be carried out in feasibility study ( fs ) phase and systems analysis and design ( sa & d ) phase 本手册旨在解释系统分析及设计的工序之典型结构,并且详细说明可行性研究阶段和系统分析及设计阶段的工作。 |
| 4. | This paper deals with a modified cass ( cyclic activated sludge system ) process in treating beer brewery wastewater , focusing on coping with sludge baulking 摘要在cass变型工艺处理啤酒废水的可行性研究阶段,由于某种原因造成了污泥膨胀现象,影响了工艺的正常运行。 |
| 5. | He focused on the pumped storage power station project in shenzhen , which has completed feasibility research and prepared to individual items construction 他重点介绍了深圳抽水蓄能电站,项目可行性研究阶段的工作已基本完成,前期工作充分,即将转入筹建期各单项工程建设。 |
| 6. | In connection with the risk management of baotou copper mine at the stage of feasibility study , the paper puts forward to the content and process of risk management system and the method 本文基于以上理论,还结合包头铜矿可行性研究阶段的风险管理工作,进行了风险管理系统的内容、步骤及风险管理报告的编制。 |
| 7. | The forecast period of effective volume is shorter than that of freeway feasibility investigation report , therefore its forecast conclusion is more accurate , and can be used for the ground of freeway management 由于预测有效流量时考虑的影响因素要比可行性研究阶段产生的预测流量全面,因此其预测结论与实际情况吻合更好,更适于指导高速公路的经营管理。 |
| 8. | Feasibility study phase will commence after the project request phase to assess the feasibility of providing an it solution for the request and to quantify the requirements , scope , costs , benefits and other implications of the proposed solution 在计划要求阶段完结后,可行性研究阶段即告展开以评审该项资讯科技方案要求的可行性,及量化拟议方案的要求、范围、成本、效益及其他影响。 |
| 9. | The paper focus on the stage of researching on the feasibility of the project , taking the third joint road from zun yi city to ma changping in guizhou province as example , and further introduce the general principles and methods which determine the road technology standard in the respect of prediction of the traffic volume , the analysis on road network construction , communication ability and service level 摘要侧重于工程可行性研究阶段,以贵州省第三联线遵义至马场坪公路为例,从交通量预测、路网结构分析、通行能力及服务水平分析等方面介绍了公路技术标准确定的一般原则和方法。 |
| 10. | So it save much energy consumption of the air conditioning running . but the preliminary investment of the psd system is higher . in the feasibility researching phase of the subway environmental control item , it is essential to do the technoeconomics analysis and forecast of the psd system 站台屏蔽门系统在我国还是一种新型的地铁环境控制系统,它将地铁车站站台与列车运行空间隔开,避免了冷量损失,节省了大量空调运行能耗,但站台屏蔽门系统初投资较高,因此在地铁环控项目的可行性研究阶段,进行站台屏蔽门系统的技术经济分析与预测非常必要。 |