Chinese translation for "合龙"

[ hélóng ] 
1.(指堤坝等) closure
2.(指桥梁等) join the two sections of a bridge, etc.
◇合龙作业 closure operation


Related Translations:
合龙工程:  closureworks
合龙坝:  closure damclosure dikeclosuredam
合龙作业:  closure operation
桥梁合龙:  closure
合龙填方:  closure fill
合龙堤:  closing dikeclosure dikeclosuredike
合龙导杆:  docking pole
合龙之介:  kawai ryunosukeryuunosuke huriganawai
河合龙之介:  kawai ryunosuke
合龙作业 闭包运算:  closureoperation
Example Sentences:
1.Where is the grand - block joining done
分段大合龙在哪进行?
2.It is difficult or even tragedy of closure of span arch construction if cable control badly
若施工控制不好将对拱肋合龙造成困难,甚至导致事故的发生。
3.The two ends of the bridge with the world ' s longest span were connected over china ' s yangtze river on monday
星期一这座世界上跨度最长的大桥在中国长江上合龙
4.Swivel bridges have common character , that is to assemble half bridges on land and then to swivel two half - bridges to unite them into one structure
摘要转体桥是以陆上拼装制作半桥、旋转合龙形成主桥为特点的一类桥梁的总称。
5.When the method of mud displacement by blasting is used to improve a foundation , treatment of the final closure is always the key and difficult point for quality control
摘要采用爆破挤淤法进行基础处理时,合龙口一直是质量控制的重点和难点。
6.After decided , combined with the character of engineering , construction condition , topography and conditions , decided location and mode of , and technological design of cut - flow
截流量选定后,结合公伯峡工程特点、施工条件及地形、地质条件,选定截流位置、截流方式以及合龙、闭气等技术设计,选择合适的围堰型式等。
7.Big bridge suit smoothly approach end establish and transport test as well as safe operation for two year , all of these have proved the reasonability of the inspection and its data analysis handling and correctness of construction control
并通过大桥的顺利合龙和建成及其通车试验和近二年的安全运营证明了施工控制的正确性、监测及其对其数据分析处理的合理性。
8.The paper deals with the problems developed in the treatment of the final closure for the southern dike for a project , analysis of the causes of the problems , plans for solving the problems and results of the treatment , thus enriching the theory and experience of mud displacement by blasting
本文介绍了某工程南堤合龙口处理中出现的问题、原因分析、处理方案及效果,从而丰富了爆破挤淤施工的理论和经验。
9.The first is to discuss erp process , datawarehouse system and the algorithm of data mining , while the second is introduction of the process of design and realization of the software system with practice works in longshan co . following is the main idea of this paper : 1 introduces the relative concept of erp , then use the uml ( the unified modeling language ) to represent the object enterprise ' s data model
全文组织如下: 1介绍了erp的相关概念、发展与实施过程,并采用统一建模语言uml分析对象企业数据模型特点,实现系统分析,设计与实现的紧密结合。介绍了结合龙山化工集团的具体企业特点,再造业务流程实现管理操作支持平台的开发,详细讨论实现过程中的技术特点。
10.So according to the technology regulation of reclamation engineering , hydraulic calculation must be carried out in the design of final closure . this paper firstly introduces the progression and present situation of reclamation engineering , emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood , the variation of time interval , multi - entrance , multi - reservoir capacity ) , and after comparing and analyzing a great deal of schemes , the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct , so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow , the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing
本文首先介绍围海工程的发展进程与国内外围海的开发现状,重点介绍了我国目前围海工程的特点及在围海工程实践中积累的经验和理论;利用fortran语言完善堵口工程龙口水力计算程序,使程序可以满足围海工程复杂工况下(如考虑内港洪水、计算时段的变化、多口门、多库容、多水闸)的龙口水力计算,并进行大量方案的比较和分析,提出合理计算方案;利用面向对象的可视化编程语言vb进行界面开发,使计算过程有良好的人机界面,更直观地对计算结果进行分析和处理;计算结果的后处理采用vb编程实现龙口水力要素最大值等值线图的绘制;并运用所编软件对福建省福清市东壁岛围垦工程进行龙口水力计算,为堵口合龙提供科学依据。