| 1. | Study on economic evaluation method of kuitan gate project 地下水回灌工程设计方案评判 |
| 2. | Landfill leachate characteristics and treatment in harbin 哈尔滨垃圾填埋场渗滤液的特性及回灌处理 |
| 3. | Storage volume sizing for landfill leachate - recirculation systems 垃圾填埋场渗滤液回灌调蓄池的容量设计方法 |
| 4. | Simulation experiment research on the middle - water recharging urban river 中水回灌城市内河实验室模拟可行性初探 |
| 5. | The total recharge adds up to 107 , 343 , 700 over the period 由于种种原因,至1999年底实际回灌单位由64个缩减至13个。 |
| 6. | The reuse of urban recycling water water quality standard for groundwater recharge 城市污水再生利用地下水回灌水质 |
| 7. | Head dynamic variation law of municipal solid waste leachate in recirculation 回灌条件下垃圾渗滤液水头动态变化规律 |
| 8. | The permeability coefficient is the key factor to pumping and injection 渗透系数大小是抽水和回灌难易程度的决定因素。 |
| 9. | The mechanism and affecting factors of accelerated stabilization by anaerobic leach recirculation 渗滤液回灌加速填埋场稳定化的机理与影响因素 |
| 10. | Article 45 artificial recharge for ground water may not deteriorate the quality of ground water 第四十五条人工回灌补给地下水,不得恶化地下水质。 |