| 1. | Foundation consolidation grouting treatment of xin ' anjiang dam 新安江大坝坝基固结灌浆补强处理 |
| 2. | Inspection of xiluodu hydroelectric power station dam foundation consolidation grouting test 溪洛渡水电站坝基固结灌浆试验检测 |
| 3. | Application of high - pressure grouting rammer in high - pressure consolidation grouting in tianhuangping 高压灌浆塞在天荒坪高压固结灌浆中的应用 |
| 4. | Test process of consolidation grouting without ballast in dam foundation of goupitai hydropower station 构皮滩水电站坝基无盖重固结灌浆试验工艺 |
| 5. | Improving measures for the drilling of solidified grout hole with ingersoll - rand lm - 500c hydraulic drill rig 露天液压钻机钻凿固结灌浆孔的改进措施 |
| 6. | Design and operation of the carrier for consolidation grouting in large diameter diversion tunnels of xiaolangdi project 小浪底工程导流洞大洞径固结灌浆施工台车的设计与运行 |
| 7. | Application of uncovered heavy single pressure grouting in consdidation grouting for dam foundation of ertan hydroelectic plant 无盖重纯压式灌浆在二滩水电站坝基固结灌浆中的应用 |
| 8. | For checking the availability and rational of the computing program , the grouting test in - situ of the xiluodu hydroelectric project were simulated and computed , and also simulated the next conditions which the result of the grouting test will be used in 为检验所编程序的合理性和适用性,对溪洛渡工程的现场固结灌浆试验进行了模拟计算,并对灌浆试验成果将来运用情况进行了补充模拟计算。 |
| 9. | The high pressure consolidation grouting is a routine measure for tunnel construction treatment , the safe operation of tunnel depends much on the grouting quality , so it is very important for tunnel construction to detect the construction quality to get rid of the safety risk 摘要高压固结灌浆是隧洞施工处理的常规手段,其质量直接影响隧洞运行安全,因此对施工质量进行检测以便排除隐患十分重要。 |
| 10. | This paper presents a new synthesized statistical method for acoustic detection data processing based on the contrast to and statistic & analysis on a great deal of data of acoustic detection , elastic modulus and tunnel operation conditions , which has been applied in many hydropower projects 为此,通过对大量声波、弹模数据和工程运行情况进行对比、统计和分析,总结出了一种针对隧洞高压固结灌浆效果的多种声波检测综合数据统计方法,并已用于多个水电项目中。 |