| 1. | To reduce earthwork costs, the volume of the fills should be equal to the volume of the cuts . 为了降低土方工程的费用,填方量应等于挖方量。 |
| 2. | Earth - moving machinery - drain , fill and level plugs 土方机械.放油注入及水准塞 |
| 3. | Simply calculation method of channel parts earthwork 渠道土方工程分段的简易计算 |
| 4. | . . . selected by our lieutenant , toshizo hijikata 是由壬生团的队长土方敏三选拔的 |
| 5. | Earth - moving machinery - determination of ground speed 土方机械.地面速度的测定 |
| 6. | . . . but as an informer for kondo and hijlkata 但实际上,我是近藤和土方委派的密探 |
| 7. | Earth - moving machinery . key - locked starting systems 土方机械.键锁紧的起动系统 |
| 8. | Earth - moving machinery . drain , fill and level plugs 土方机械排液加液和液位螺塞 |
| 9. | Vegetation technology in landscaping - soil working 风景设计中的植被技术.土方工程 |
| 10. | Earth - moving machinery - safety - general requirements 土方机械.安全.一般要求 |