| 1. | 18 . gpr survey of volume of soil and stone in shenzhen jihe highway 18 .深圳机荷高速公路路基土石方探地雷达勘测 |
| 2. | Multiple designal gradiented calculations of cubic soil and stones in cass software 软件中多个设计坡度的土石方计算 |
| 3. | The application of method of alter average section in earthwork volume calculation 用变更平均断面法计算铁路土石方工程量 |
| 4. | Application of yang chizhong ' s filtering estimation method for earthwork computation 杨赤中滤波推估法在土石方量计算中的应用 |
| 5. | Automatic and interactive earthwork preparation and plane cross design are also supplied 除平纵横设计模块之外,系统还具有土石方量自动和交互调配、平面交叉设计等功能。 |
| 6. | As the development of society and economy , the construction of city is very fast , and it is outstanding to adjust earthwork in construction 摘要随着经济社会的发展,城市化进程日益加快,城市建设中的土石方配置问题尤为突出。 |
| 7. | The present method is verified as feasible through the application of an earthwork allocation and transportation problem of a high rockfill dams 在某大型堆石坝土石方调运中的应用及其与线性规划方法结果比较表明,本文提出的方法是可行的。 |
| 8. | It is analyzed that how to allocate and manage the earthwork during the construction of city , using the software of gis and linear programming model 就如何运用gis分析计算软件和线性规划模型对城市建设土石方进行优化配置以及管理,作一粗浅的分析和探讨。 |
| 9. | The power plant was decided to be sited at yahekou in 1972 . beginning leveling of the site on aug . 10 , 1992 , taking 9 months to finish an earthwork with volume of 1 . 67 million m3 1鸭河口电厂1972年选址, 1992年8月10日场地破土平整,历时9个月,挖填土石方267万立六米。 |
| 10. | T165 - 1 bulldozer is semi - rigid suspended , power shift , hydraulically controlled and track - type . it is applicable for road construction , water and electricity engineering farmland leveling , port building , mining and other engineering conditions 1推土机系半刚性悬挂、机械传动、液压操纵的履带推土机。可用于道路修筑、水电工程、农田改造、港口建设矿山开发及其它建筑工程项目的土石方作业。 |