Chinese translation for "地层移动"
|
- earth movement
earth-shift ground movement groundmovement strata displacement surface break surfacebreak
Related Translations:
地层阻力: formation resistance 地层连通: combination of zones 倾斜地层: dipping formationdipping strataedge seaminclined stratumsloping bedtilted stratatilted stratum 地层推断: stratigraphic prognosis
- Example Sentences:
| 1. | Influence on strata deformation for staged construction of excavation in soft clay 软土基坑分步开挖时地层移动规律探讨 | | 2. | Prediction of longitudinal movement and deformation of stratum in longitudinal section due to tunnel construction by shield 盾构法施工隧道纵向地层移动与变形预计 | | 3. | In an urban environment , many high - rise buildings are supported by pile foundations and tunneling almost invariably will cause ground movements , which in turn will impose axial and lateral forces on the pile foundations 城市中很多高层建筑采用的是桩基础,隧道工程引起的地层移动会对桩基础施加轴向和侧向力。 | | 4. | In this thesis , the author first takes a review on the computational theories of the ground movements and pile responses induced by tunnelling . second , a brief introduction is made about theories of constitutive models and ground movements 本文首先总结了目前国内外隧道工程引起的地层移动以及邻近桩反应研究的现状,简要的介绍了土体本构模型理论以及地层移动理论。 | | 5. | The deformation of parallel buried pipelines and perpendicularly crossing buried pipelines induced by pipe jacking is analyzed by 3 - d fem . the displacement pattern of buried pipelines and its influence factors are studied . the measures for protecting neighborhood underground pipelines and relevantly controlling measures for minishing the ground movements during pipe jacking are advanced 采用ansys程序进行了三维有限元建模,模拟了顶管施工对相邻平行地下管线和垂直交叉地下管线产生的影响,研究了地下管道的位移模式,对影响地下管线位移的主要因素进行了分析,提出了顶管施工中对邻近地下管线的保护措施以及减小地层移动的控制措施。 | | 6. | By in - situ test , three dimention fem numerical solution and theoretical analysis , a systematic research is made on the disturbance of soil , ground movements and the influence on underground pipelines induced by pipe jacking . some useful conclusions are obtained in the thesis . the main content of the thesis is as follows : 1 本文以杭州市石桥路顶管工程为背景,通过现场测试、三维有限元模拟计算以及理论分析对顶管施工中土体扰动与地层移动以及对地下管线的影响进行了系统深入的分析研究,得出了一些有益的结论。 |
- Similar Words:
- "地层岩心柱状样品" Chinese translation, "地层岩性" Chinese translation, "地层岩柱" Chinese translation, "地层延续时限" Chinese translation, "地层液体过筛" Chinese translation, "地层仪" Chinese translation, "地层异常" Chinese translation, "地层因数" Chinese translation, "地层因数测井" Chinese translation, "地层因素" Chinese translation
|
|
|