| 1. | The first phase of the infrastructure project 基础设施工程第一期 |
| 2. | Proposals for infrastructural projects should include relevant mitigation measures 有关基础设施工程的建议应包括相应的纾缓措施。 |
| 3. | Engineering infrastructure works for pak shek kok development , stage 2d - road l3 and road l7 白石角发展计划基础设施工程第2d阶段l3号及l7号道路工程 |
| 4. | Engineering infrastructure works for pak shek kok development - stage 2b - improvement and extension of yau king lane 白石角发展计划基础设施工程第2b阶段-优景里改善及延长工程 |
| 5. | 714cl - engineering infrastructure works for pak shek kok development , stage 2b - improvement and extension of yau king lane 714cl白石角发展计划基础设施工程第2b阶段优景里改善及延长工程 |
| 6. | 720cl - engineering infrastructure works for pak shek kok development , stage 2c - road l5 and adjoining parking and loading unloading areas 720cl -白石角发展计划基础设施工程第2c阶段- l5道路及毗邻泊车和上落客货区 |
| 7. | A large number of infrastructure projects in such areas as water conservancy , transportation , telecommunications , energy and environmental protection have been completed 建设了一大批水利、交通、通信、能源和环保等基础设施工程。 |
| 8. | A large number of infrastructure projects in such areas as water conservancy , transportation , telecommunications , energy and environmental protection have been completed 建设了一大批水利交通通信能源和环保等基础设施工程。西部大开发取得重要进展。 |
| 9. | 719cl - kai tak development - engineering review 711cl - kai tak development - advance infrastructure works for developments at the southern part of the former runway 719cl启德发展计划工程检讨711cl启德发展计划前跑道南面发展项目的前期基础设施工程 |
| 10. | Progress report on 72lc - prison development plan at hei ling chau feasibility study and preliminary site investigation for land formation and infrastructure works 72lc喜灵洲监狱发展计划为土地平整和基础设施工程而进行的可行性研究及初步工地勘测工作进度报告 |