| 1. | Sealing test for pressurized waveguide tubing and assemblies 加压波导管及其组件的密封试验 |
| 2. | Mechanical seal testing code for stirred vessels 釜用机械密封试验规范 |
| 3. | Test methods for cable accessories . part 4 : tightness test 电缆附件试验方法.第4部分:压力密封试验 |
| 4. | Sealing tests for pressurized waveguide components and assemblies 充气波导部件和装置的密封试验 |
| 5. | Test guide of sf6 gas tightness for high - voltage switchgear 高压开关设备六氟化硫气体密封试验导则 |
| 6. | Test method for calibrating radioisotope hermetic test apparatus 校准放射性同位素密封试验仪的方法 |
| 7. | Passive electronic component parts - test method 14 , panel seal test 无源电子元器件.测试方法14 :板的密封试验 |
| 8. | Code for test of machanical seal 机械密封试验方法 |
| 9. | Seat testing pressure 压力气密封试验压力 |
| 10. | As the valve is fully closed , the leakage in sealing testing can be lowered to zero 阀门完全关闭时,密封试验泄漏量为零。 |