| 1. | Management of working - day claims for construction projects in fidic construction contracts 施工合同条件下的工期索赔管理 |
| 2. | Discrimination in relative concepts of period claim in international construction contract 国际施工合同中工期索赔相关概念的辨析 |
| 3. | A comprehensive method for claim damages on time limit for a project network planning technology 网络计划技术工期索赔综合分析方法 |
| 4. | This paper also gives systematical analysis to the types of project delay and the handling principles of claims of delay and cost 阐述了工期延误的类型,工程延误的处理原则,工期索赔的分析方法,费用索赔处理的基本原则和计算方法。 |
| 5. | This thesis mainly analyses the claim for extension of time and financial claims . through collecting a good deal of relational material , the thesis puts forword analysis methods and calculation models of the two sorts of claim 在此基础上,本文重点研究了工期索赔与费用索赔,通过总结归纳大量文献资料,较为系统地提出了两类索赔的分析方法与计算模型。 |
| 6. | As a kind of method expounded of late years that computes the numerical value of time claimed , dynamic analysis method ( d . a . m ) evaluates delay influence on construction time by contrasting the network condition before delay occurrence with the network condition after delay occurrence 动态分析法是近年来提出的计算施工延误工期索赔值的一种方法。该方法通过对某一施工延误发生前和该延误发生后前网络状态的差异,来评定该诞误对总工期的影响。 |
| 7. | In analysis methods of the claims for extension of time , the thesis puts forward the time impact analysis ( tia ) , it is a delay evaluation technique with the basis of the chronological summarization of delay events , the treatment of overlapped events , liability apportionment of concurrent delay and allocation of total float time 在工期索赔中,本文介绍了以延误事件时序化处理、搭接事件处理、共同延误责任分摊和浮动时间的分配为基础的网络时间影响( tia )分析法进行延误分析的方法和过程。 |
| 8. | Abstract : during treatment of a delayed schedule , specific deliberation of calculation on claim for extension of time should be paid attention to the following tasks ; because the critical path of a network might be changed from time to time and the appropriate utilization of float should be carefully considered in the actral schedule , therefore , the claim for extension of time can not be calculated only by the network , but the actual period where the cause of a delaed schedule is set should be considered , and should be calculated on the basis of the actual schedule which is approved by the supervising engineer 文摘:在工期延误处理时,工期索赔计算应特别注意:由于网络的关键线路可能发生变化,且实际进度计划要考虑时差的合理利用,因此工期索赔不能仅按网络图计算,而要考虑工期延误原因的实际发生时间,按经监理工程师批准的实际进度计划计算。 |